Crimp a ferrule onto each end of the wire.
Loosen the nuts on the angled cable gland (item 2 in Fig. 4.2 - 3
).
Fold up the angled cable gland.
Feed the power supply cable through the angled cable gland to the terminal panel X100 (see
X100 in Fig. 4.2 - 4
).
Connect the cable to the terminal and ensure that it has a sufficient bending radius. The wires
must not be kinked.
Fold up the angled cable gland (item 2 in Fig. 4.2 - 3
) and tighten the nuts hand-tight.
4.2.4.5 Checking connections to the primary side of the three-phase transformer T1
The primary side of the three-phase transformer T1 must be configured for the respective supply
voltage.
Therefore check at the terminal block (see Fig. 4.2 - 5
) to see whether the primary side of the
three-phase transformer T1 has been correctly connected for the respective supply voltage.
4
Fig. 4.2 - 5 Terminal block for the primary side of the three-phase transformer T1
See item 3 in Fig. 4.2 - 6, page 161 for the
position of the terminal block
3 x 204 VAC
3 x 230 VAC
3 x 380 VAC
3 x 400 VAC
3 x 415 VAC
User manual SIPLACE D4 4 Setting up and commissioning
From software version SR.605.xx 07/2008 EN Edition 4.2 Infrastructure at the installation location
161
PLEASE NOTE 4
The Japanese supply network (3 x 200 VAC) and supply networks in the USA (3 x 208 VAC) are
connected to terminals for 3 x 204 VAC.
4
4
4
4
Fig. 4.2 - 6 Position of the terminal block with primary connections for the three-phase transformer T1
(1) Three-phase transformer T1
(2) Sign with the connection wiring diagram for the primary side
(3) Terminal block with primary connections for the three-phase transformer T1
4 Setting up and commissioning User manual SIPLACE D4
4.2 Infrastructure at the installation location From software version SR.605.xx 07/2008 EN Edition
162
4.2.4.6 Checking the inrush current limitation jumpers
The inrush current limitation must be configured in relation to the supply voltage. This is done us-
ing wire jumpers on the inrush current limitation board (item 1 in Fig. 4.2 - 7
).
4
Fig. 4.2 - 7 Position of the board and connectors for the inrush current limitation
(1) Inrush current limitation board
Check the jumper assignment and correct if necessary.
Supply voltage 3 x 200 VAC / 3 x 208 VAC / 3 x 230 VAC (see Fig. 4.2 - 8
)
Supply voltage 3 x 380 VAC / 3 x 400 VAC / 3 x 415 VAC (see Fig. 4.2 - 9
) 4