OPERATING MANAUAL(FOR ENGINEERS) - 第66页
Page 3-2 3Y3C-E-EMD03-A01-00 3-1 Changing Production Data This section describes changing data, giving an example of loading data from PT100. T o load data from PT100, two ways are available: “a) to transfer from PT100 t…

Page 3-1
3Y3C-E-EMD03-A01-01
Chapter 3
CHANGING PRODUCTION
CHANGING PRODUCTION
BOARD
BOARD
Changing production board
For mounting the parts on different board from the former, it is necessary to adjust
units or supply production materials according to the board.
This section describes the operation for changing the production board, considering
that the data of it is on the PT100.
Machine adjustment points due to the change of production board
Board holder
Transferring rail width
adjustment (automatic)
Setting tape feeder
Transfer head
Nozzle change
(change if necessary)
Board X-Y table
Operating part
Holder pin position adjustment
(manual)
Production data change
(manual)
Front (rear) transferring conveyor
Transferring rail width adjustment
(automatic)
Pin positioning unit
(option)
Pin position adjustment
(manual)
4G3C-AE01
07JHC2AA
15ULC0AA
TAPE-002
1231C1AA
11DGC2AA

Page 3-2
3Y3C-E-EMD03-A01-00
3-1 Changing Production Data
This section describes changing data, giving an example of loading data from PT100. To load data
from PT100, two ways are available: “a) to transfer from PT100 to this machine” and “b) loading by
file operation.”
• When loading data in floppy disk, see “Chapter 6 File Operation.”
∗ Loading new data for use deletes the old one. To keep old data, save it.
NOTICE
In using chip which is not registered to the standard chip data library, it is
necessary to carry out chip recognition teaching by this machine.
Refer to “Chapter 5 Teaching” for teaching board recognition and chip
recognition.
a) Transferring from PT100 to this machine
1. Display the main menu screen, and
send data of production board to be
changed from PT100.
∗ Refer to “PROGRAMMING MANUAL” for
sending data from PT100.
• Sending data from PT100 changes the data
name on the right of screen to the sent one.

Page 3-3
CHANGING
PRODUCTION BOARD
3
Changing Production Data
b) Loading by file operation
1. Press
File
managment
.
• File operation screen appears.
2. Press PT100 .
• Change the object device to PT100.
∗ To display the data of PT100 by this machine, it
is necessary to register the list on PT100 .
( PROGRAMMING MANUAL)
3. Press Load .
• Load is highlighted.
To the next page
3Y3C-E-EMD03-A01-00