OPERATING MANAUAL(FOR ENGINEERS) - 第76页
Page 3-12 PCB T ransfer T est 4 . Press UNLOCK and Carry in . 5 . Press UNLOCK and Load . 6 . Press UNLOCK and Unload . 7 . Press UNLOCK and Carry out . • During transferring, board at the transfer end position lights as…

Page 3-11
CHANGING
PRODUCTION BOARD
3
3-6 PCB Transfer Test
After adjusting transfer rail width and supporters, carry out the board transfer test and check that
board is transferred without catching on the way.
NOTICE
Actually, transfer test of whole line is carried out. This section describes the test
in the case of board on the conveyor after pre-process, completing the transfer
test before this.
1. Turn on servo switch.
2. Press
Product
config
.
• Production setting screen appears.
3. Press
UNLOCK
and PCB transfer .
• Board transfer screen appears.
OFF ( )
ON ( )
SERVO
To the next page
3Y3C-E-EMD03-A02-00
3Y3C-EEn-Main-001

Page 3-12
PCB Transfer Test
4. Press
UNLOCK
and Carry in .
5. Press
UNLOCK
and Load .
6. Press
UNLOCK
and Unload .
7. Press
UNLOCK
and Carry out .
• During transferring, board at the transfer end
position lights as Carry in → Load → Unload →
Carry out, and after transferring the board at
the transfer start position goes out and lights at
the end position.
∗ Repeating the same operation two times
makes a board transferring error.
Press the emergency stop button to remove
the board.
3Y3C-E-EMD03-A02-00
1
2
3
4

Page 3-13
CHANGING
PRODUCTION BOARD
3
3-7 Checking the Mounting by Conditional Mounting
Mounting by conditional mounting before starting production is checked in the following proce-
dures.
1. Press
Production
.
• After mounting a board, the screen for cycle
stop appears and the machine stops.
2. Press .
3. Select the condition.
Enter the No. of selected conditional
data.
4. Press .
∗ For improper mounting state, see “5-5 Teach-
ing the Mount Position.”
To the next page
3Y3C-E-EMD03-A02-00
3Y3C-EEn-PrCm-001
3Y3C-EEn-Main-001
1
2
3
Conditional
mounting