4OM-1751 1-19 1304-001 4.1.2 Main Air Pressure Check Cycle : Every Day (Required Time : 1 minute) Main Air Pressure F4A9 Procedure Set Air Pressure 0.45 MPa (4.6 kgf/cm 2 ) Check to see that the air pressure is "Min…

4OM-1751
1-181304-001
4. Inspection, Cleaning, and Lubrication Spots
The following describes about the maintenance tasks required for each individual
units.
Reference
Refer to "2. Maintenance Check List" in "Chapter 1" for the maintenance items
4.1 Air Source
4.1.1 Air Blow Pressure Check
Cycle : Every Day (Required Time : 1 minute)
Air Blowing Pressure
F4A8
Procedure
Check to see that the pressure gauge reads the initial setting (0.05 MPa
(0.5 kgf/cm
2
)). Do not change the pressure unless necessary.
Notice
The pressure is factory-adjusted upon shipment of the machine.
4. Inspection, Cleaning, and Lubrication Spots

4OM-1751
1-191304-001
4.1.2 Main Air Pressure Check
Cycle : Every Day (Required Time : 1 minute)
Main Air Pressure
F4A9
Procedure
Set Air Pressure 0.45 MPa (4.6 kgf/cm
2
) Check to see that the air pressure is "Min.
0.4 MPa (4.1 kgf/cm
2
)" while the machine is running.
If not, adjust the air pressure.
4.1 Air Source

4OM-1751
1-201304-001
4.1.3 Drain Check
Cycle : Every Week (Required Time : 5 minutes)
Cap
Drain
F4A10
Procedure
section to drain.
4.1 Air Source