32 Detail documentation of the PCB transport interfac e is avail able from Siemens AG. Technical Data: Signal Interfaces Conveyor 1 is Off Conveyor 2 is On Conveyor 1 is Off Conveyor 2 is On Conveyor 1 is On Conveyor 2 i…

31
1. After switching-on the station
Technical Data:
Signal Interfaces
Conveyor 1 is On Conveyor 2 is Off
Requirement
Delivery
Permission
Receival
Requirement
Delivery
Permission
Receival
Transport Direction
Signal Interface (20-Pin Ribbon Cable Connector)
to preceding station x3 to following station x4
Pin 13 GND 24V Pin 10 Reserved
Pin 14 Arrived Pin 9 Reserved
Pin 15 Permission Pin 8 Reserved
Pin 19 Request Pin 4 + 30V DC
unsaturated
Pin 20 GND 24V for request / re-
leased (contact separation)
Pin 5 GND 24V
Pin 18 Released Pin 6 + 24V DC
Pin 12 Spurious signal loop Pin 11 Spurious signal loop
Pin 11 Pin 12
Pin 3 + 24V DC Pin 15 Permission
Pin 2 GND 24V Pin 13 GND 24V for per-
mission / arrived
(contact separation)
Pin 1 + 30 V DC unsaturated Pin 14 Arrived
Pin 8 Reserved Pin 18 Released
Pin 9 Reserved Pin 19 Request
Pin 10 Reserved Pin 20 GND 24V
Conveyor Section 1
PCB
Sensor
PCB
Sensor
Conveyor Section 2
Station n
transports
PCB
to delivery
Station n+1
is ready to
receive PCBs

32
Detail documentation of the PCB
transport interface is available from
Siemens AG.
Technical Data:
Signal Interfaces
Conveyor 1 is Off Conveyor 2 is On
Conveyor 1 is Off Conveyor 2 is On
Conveyor 1 is On Conveyor 2 is On
Transport Direction
Transport Direction
Conveyor Section 1
PCB
Sensor
Conveyor Section 2
Station n Station n+1
has just received
the PCB
Requirement
Delivery
Permission
Receival
Requirement
Delivery
Permission
Receival
Transport Direction
Conveyor Section 1
PCB
Sensor
Conveyor Section 2
Station n
has just
delivered PCB
Station n+1
waits for PCB from
station n, but has
not received it
Requirement
Delivery
Permission
Receival
Requirement
Delivery
Permission
Receival
PCB
Sensor
Conveyor Section 1
Conveyor Section 2
Station n
delivers PCB
to station n+1
Station n+1
waits for PCB
from station n
Requirement
Delivery
Permission
Receival
Requirement
Delivery
Permission
Receival
PCB
Sensor
2. PCB handling has started
3. PCB is at delivery
4. PCB transport is finished

33
Technical Data:
Connections
Pressure Supply
Power Supply:
3 m Cable with
CEKON-Connector 3 x 16A
230 Inner Edge
Fixed Side of Transport
LAN Supply
Signal Interface
PCB Conveyor
Connections and Energy Required
Mains voltage requirement
230/400 V∼ / 119/208 V∼
± 5%, 50/60 Hz
Total connected load 5 kVA
Gross output 5 kW
Fuses 3 x 16 A
Power outage max. 20 ms
Compressed air requirements min. 5.5 bar, 250 Nl/min
Compressed Air Specification
Particles: max. particle size by density,
based on ISO/DIS 8573-1 Class
Particle size
Particle density
0.1 µm
0.1 mg/m³
Dew:
Pressure dewpoint
Dewpoint
Class 4
+ 3° C
Oil:
max. oil content
Particle density
Class 1
0.01 mg/m³