00194994_01 - 第45页
SIPLACE Software Guide Version 408.xx 4 Switching the SIPLACE line on and off Issue 03/06 EN 4.1 Switching on the SIPLACE line 45 Æ When the "Press start button“ prompt appea rs, press one of the start buttons. (The…

4 Switching the SIPLACE line on and off SIPLACE Software Guide Version 408.xx
4.1 Switching on the SIPLACE line Issue 03/06 EN
44
4.1.3 Switching on the station / Starting the user interface of the SC program
CAUTION
Only switch on the station after the desktop is displayed on the SIPLACE Pro computer monitor.
Otherwise, communication problems may occur. 4
Æ Switch on the station at the main switch and check to see if the manometer displays the re-
quired operating pressure after you have switched the station on.
The station computer software is loaded. If a SIPLACE Pro computer is connected and com-
munication is error-free, the Main view of the station computer user interface for the "Operator“
access level appears (see Fig. 4.1 - 1).
4
Fig. 4.1 - 1 Main view after loading the station computer software (example: SIPLACE CF)
NOTE
The current state of the station is displayed in the status field in the "Status“ line, and the action
you are to execute is displayed in the "Action:“ line (see Fig. 4.1 - 1). 4

SIPLACE Software Guide Version 408.xx 4 Switching the SIPLACE line on and off
Issue 03/06 EN 4.1 Switching on the SIPLACE line
45
Æ When the "Press start button“ prompt appears, press one of the start buttons.
(The start buttons are located on the input side and on the output side.)
A reference run is executed on all axes. The station is ready for operation after the reference
run has been completed.
The icon is displayed in the work area of the user interface.
4.1.4 "Switching on the SIPLACE line" flow chart
The following flow chart shows the actions executed while the SIPLACE line is being switched on
and started up. 4

4 Switching the SIPLACE line on and off SIPLACE Software Guide Version 408.xx
4.1 Switching on the SIPLACE line Issue 03/06 EN
46
4
Fig. 4.1 - 2 "Switching on the SIPLACE line" flow chart
Nozzle check
If necessary, change
nozzle configuration
Test set-up
Set tracks to full
No
Tasks of the programming system
computer
Load panel data
Fiducials
OK?
Make settings on the machine
Download-Assistent
Check the set-up
(attach feeder modules)
Switch on
Wait for reference run
Track
errors
Yes
Abort
placement
No
PCB to output conv.
Yes
Station computer
Bold type:
Italic type:
To be carried out by the
operator
Carried out or signaled
by the station
Confirm change over in the
download wizard
Wait for PCB
Introduce PCB
Press the Start button