4.3.5 Fitting the extension kits to the machine frame
4.3.5.1 Fitting the extension kit on the PCB output side
When the placement machine is delivered, the extension kit on the PCB output side and the PCB
output conveyor are dismantled. The procedure for attaching the extension kit to the PCB output
side is as follows:
– Fitting the output conveyor
see Section 4.3.6, page 265
– Fitting the extension kit on the PCB output side see Section 4.3.7, page 266
– Installing the axis unit see Section 4.3.8, page 272
– Fitting the indicator lamp see Section 4.3.13, page 293
– Integrating the placement machine into the line see Section 4.3.16, page 301
– Making final adjustments to the placement machine see Section 4.3.17, page 304
4.3.5.2 Fitting the extension kit on the PCB input side
If the extension kit on the PCB input side was also removed for ease of transportation, you will
have to carry out the following steps before integrating the placement machine into the line (see
Section 4.3.16
, page 301):
– Fitting the input conveyor
see Section 4.3.9, page 280
– Fitting the extension kit on the PCB input side see Section 4.3.10, page 282
– Fitting the box PC unit see Section 4.3.11, page 287
– Installing the axis unit see Section 4.3.12, page 291
– Fitting the indicator lamp see Section 4.3.13, page 293
– Integrating the placement machine into the line see Section 4.3.16, page 301
– Making final adjustments to the placement machine see Section 4.3.17, page 304

User Manual SIPLACE X-Series 4 Setting up and commissioning
From software version SR.605.xx 07/2008 EN Edition 4.3 Setting up the placement machine
265
4.3.6 Fitting the output conveyor
4.3.6.1 Tools
– Allen keys, DIN 911, set
– Phillips screwdriver, size 1
4.3.6.2 Assembly
4
Fig. 4.3 - 7 Output conveyor - dual conveyor
(1) Rail, output conveyor
(2) Rail, processing conveyor 2
(3) Cable cover 20 x 200
(4) Countersunk screw, ISO 7046, M3x6, 2x per cable cover
(5) Cable cover 20 x 310
(6) Fillister head screw DIN 912, M3x5, 1x per cable cover
(7) Fillister head screw DIN 912, M6x16, and washer, 4x per rail
(8) Guide for hexagonal shaft
(9) Hexagonal shaft (single conveyor: one, dual conveyor: two)
(10) Drive unit

4 Setting up and commissioning User Manual SIPLACE X-Series
4.3 Setting up the placement machine From software version SR.605.xx 07/2008 EN Edition
266
→ Remove the cable covers (items 3 and 5 in Fig. 4.3 - 7, page 265) from the rails (item 1 in Fig.
4.3 - 7
, page 265) of the output conveyor.
→ Carefully place the rail (item 1 in Fig. 4.3 - 7
, page 265) against the rail on the processing
conveyor (item 2 in Fig. 4.3 - 7
, page 265).
CAUTION 4
Be careful not to cut through any of the light barrier or drive motor cables.
→ Fix each rail using 4 fillister head screws M6x16 and the associated washers (item 7 in Fig.
4.3 - 7
, page 265).
→ Connect the power cable to the light barriers and drive motors.
→ Fix the cable covers in place (item 3 and 5 in Fig. 4.3 - 7
, page 265).
→ Introduce the hexagonal shaft (item 9 in Fig. 4.3 - 7
, page 265) into the drive unit (item 10 in
Fig. 4.3 - 7
, page 265).
→ Make sure that the hexagonal shaft guide (item 8 in Fig. 4.3 - 7
, page 265) always points to-
wards the conveyor side wall to which the drive unit (item 10 in Fig. 4.3 - 7
, page 265) is fixed.
4.3.7 Fitting the extension kit on the PCB output side
4.3.7.1 Tools
– Allen keys, DIN 911, set
– Machine key