Installation First use 106 Inspection system X7056 | Operating manual | Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a Perform the following work steps: 1. Open the Windows Explorer on the inspection system. 2. Check if …

Installation
First use
105
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
3. Start automatic operation, see „Starting PCB inspection“ (Page
156).
The PCB is automatically infed, inspected, and outfed.
The PCB transport is checked.
Checking the calibration
To ensure that the cameras were not de-calibrated during trans--
port, the calibration must be checked.
Precondition: The pre-acceptance inspection program is loaded.
The PCB corresponding to the inspection program is fed in.
The fiducials are correctly located.
The pre-acceptance defect protocol is available.
ATTENTION
Faulty operation due to untrained personnel
Faulty inspection of the PCB.
Calibration may only be done by persons especially trained for
that purpose.
Perform the following work steps:
1. Start automatic operation, see „Starting PCB inspection“ (Page
156).
The PCB is automatically infed, inspected, and outfed.
2. Compare the detected defects with the defects from the pre-
acceptance defect protocol.
The detected defects correspond to the defects from the pre-
acceptance defect protocol.
? Significantly more defects are found?
The following causes are possible: the inspection program
settings are faulty, the PCB was incorrectly fed in or the
cameras are out of calibration.
The possible causes can be checked by a trained person; if
necessary, do a geometric calibration or grayscale value cali--
bration.
The calibration is checked.
Checking the network connections
Precondition: The inspection system is switched on.
The verification station/SPC server are connected and switched
on.

Installation
First use
106
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
Perform the following work steps:
1. Open the Windows Explorer on the inspection system.
2. Check if the drives R: (verification station)/ S: (SPC server) are
connected.
The drives are connected.
The drives are not connected.
? The verification station/SPC server are connected and switched
on.
Switch on verification station/SPC-server.
Doubleclick drive R:/S: in Windows Explorer.
The network connections are checked.
Checking the data transfer to the verification station
Perform the following work steps:
1. Start the Viscom software, see „Starting the Viscom software“
(Page 155).
2. Select an inspection plan, see „Choosing an inspection
program“ (Page 156).
3. Start automatic operation, see „Starting PCB inspection“ (Page
156).
The PCB is automatically infed, inspected, and outfed.
4. Open the Windows Explorer on the inspection system.
5. Click D
RIVE R: > DATA > WORK.
The inspection system .res files are in the WORK directory.
The data transfer to the verification station is checked.
Checking the data transfer to the SPC server
Perform the following work steps:
1. Repeat steps 1 to 3.
2. Classify the found defects at the verification station.

Installation
First use
107
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
3. Click DRIVE S: > DATA > WORK.
The VPC files of the verification station are in the WORK direc-
tory.
The data transfer to the SPC server is checked.