X7056_Operating manual_en.pdf - 第155页
Operation Operating the inspec tion system 155 Inspection system X7056 | Operating manual | Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a Operating the inspection system In this section, operation of the inspection syst…

Operation
Switching on the inspection system
154
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
Switching on the inspection system
This section describes how to switch on the inspection system.
The work steps in detail:
Switching on the system (Page 154)
Registration (Page 154)
Switching on the system
Precondition: The inspection system is properly installed, see „Installation“
(Page 67).
The verification station computer is switched on and has booted
up.
The external in- and outfeed conveyors are switched on.
All of the system doors are closed.
Perform the following work steps:
1. Turn the main switch to
ON.
2. Press the white ON button.
The white ON button lights up.
The control elements are supplied with current.
3. Set the key switch to
ON.
4. Turn on the UPS devices.
The system computers boot up.
5. Switch on the monitor.
The monitor displays the WindowsREGISTRATION WINDOW.
The inspection system is switched on.
Registration
NOTE
The user name si and the password viscom are default settings.
These settings can be customized. Adapting the configuration must
be done by Viscom service personnel.
Perform the following work steps:
1. Press the key combination
Ctrl+Alt+Delete.
The monitor displays the Windows REGISTRATION WINDOW.
2. Enter the user name
si and the keyword viscom.
Log on is successful.

Operation
Operating the inspection system
155
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
Operating the inspection system
In this section, operation of the inspection system is described.
The „Operation elements“ (Page 34) and the „Display elements“
(Page 34) are described in the chapter "Product Description".
The following operation steps are described:
Starting the Viscom software (Page 155)
Choosing an inspection program (Page 156)
Starting PCB inspection (Page 156)
Interrupting PCB Inspection (Page 157)
Continuing Inspection Operation (Page 157)
Ending inspection operation with PCB outfeed (Page 157)
End inspection operation (Page 157)
Closing the automatic operation window (Page 158)
Ending the Viscom software (Page 158)
Starting the Viscom software
Precondition: The inspection system is switched on. See „Switching on the
inspection system“ (Page 154).
NOTE
Sometimes there are waiting periods when the Viscom software is
started, because the warmup and maintenance procedures for
working with the X-ray tube have started and must end before it is
possible to work with the Viscom software.
NOTE
The user name si and the password viscom are default settings.
These settings can be customized. Adapting the configuration must
be done by Viscom service personnel.
Starting Viscom
Vision Pilot
Perform the following work steps:
Click V
ISCOM VISION PILOT in the Windows start menu.
The Viscom Vision Pilot starts.
The VISCOM VISION PILOT (Page 110) start display opens.
The Viscom Vision Pilot is started.

Operation
Operating the inspection system
156
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
Log on
Perform the following work steps:
1. Enter the user name and keyword.
2. Click L
OG IN (Page 110).
The window SYSTEM STATUS INFORMATION (Page 111) is
displayed.
Log on to VVP is successful.
The Viscom software is started.
Choosing an inspection program
Changing the inspection program is described as follows.
Precondition: A valid inspection program was generated and is present on the
system.
Perform the following work steps:
1. Click C
HANGE INSPECTION PLAN (Page 112).
The window CHANGING INSPECTION PLANS (Page 141) opens.
2. Select an inspection plan and click on E
XECUTE (Page 141).
The inspection program is loaded.
The VISCOM VISION PILOT (Page 110) start display opens.
The inspection program is selected.
Starting PCB inspection
Precondition: The appropriate inspection program is loaded.
A PCB is in the transport system.
NOTE
The "Automatic operation" window is fully described in Chapter
„Software“ > „Automatic mode“ (Page 114).
Perform the following work steps:
1. Click A
UTOMATIC OPERATION (Page 112).
The AUTOMATIC MODE (Page 114) window is opened.
2. Click S
TART PCB INSPECTION (Page 116) in the operations
bar.
Automatic PCB inspection begins.
Inspection operation is started.