Maintenanc e Maintenance schedule 175 Inspection system X7056 | Operating manual | Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a Half-yearly m aintenanc e Component Measures Time required Sys te m P erform a geometric c…

Maintenance
Maintenance schedule
174
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
Lift gate See „Lubricating the lift gate“
(Page 198)
approx. 30
min.
Positioning unit, flat
panel detector (FPD)
Perform these steps:
Check runner block for
contamination.
The guide carriage should
move easily, without deflec-
tion.
Grease runner blocks, see
„Lubricating the runner
blocks and spindles“ (Page
192).
approx. 30
min.
Positioning unit, flat
panel detector (FPD)
Perform these steps:
Check belts for damage and
contamination.
Clean the transport system
and belts with a clean, soft
lint-free cloth to remove all
dust.
Check belts for smooth
movement.
approx. 15
min.
X-ray tube When tube is longer not used,
perform a warmup, see „Warm-
up procedure“ (Page 220)
Depending
on how long
the tube is
switched off
AOI system computer Perform these steps:
Check the ventilator function.
Visual check of filter mats on
system computer.
If mats are contaminated,
remove them and blow out
with compressed air.
If any defects, exchange filter
mat, see „Exchanging filter
mat on AOI system
computer“ (Page 223).
approx. 5-
15 min.
System computer AXI Perform these steps:
Check the ventilator function.
Visual check of filter mats on
system computer and
housing.
If mats are contaminated,
remove them and blow out
with compressed air.
If any defects, exchange filter
mat, see „Exchanging filter
mat on AXI system
computer“ (Page 225).
approx. 5-
15 min.
XM sensor head, XM 3-D
camera technology
Check the ventilator function. approx. 5-
15 min.
3-monthly maintenance (Forts.)
Component Measures Time
required

Maintenance
Maintenance schedule
175
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
Half-yearly maintenance
Component Measures Time
required
System Perform a geometric calibration. approx. 6 hr.
XM sensor head, XM 3-D
camera technology
See „Maintaining the XM 3D
camera technology“ (Page 227)
approx. 5-
10 min.
Transport belts AOI Perform these steps:
Check the transport belts for
abrasion and damage.
Inspect the transport belts
and replace if necessary, see
„Exchanging the AOI trans-
port belts“ (Page 200).
approx. 5
min.
approx. 15
min.
approx. 1 hr..
Transport belts AXI Perform these steps:
Check the transport belts for
abrasion and damage.
Inspect the transport belts
and replace if necessary, see
„Exchanging the AXI trans-
port belts“ (Page 210).
approx. 5
min.
approx. 15
min.
approx. 1 hr..
Z-Axis Inspect the belt and replace if
necessary. The belt must be
exchanged by Viscom
personnel.
approx. 1 hr.
Transport system AOI Perform these steps:
Check that fixed and movable
transport plates are tightly
fastened.
Lubricate rollers if needed
Check the automatic width
adjustment; re-set if neces-
sary.
Grease the spindles und
guides, see „Lubricating the
spindles and travel guides -
AOI“ (Page 186).
approx. 20
min.
Transport system AXI Perform these steps:
Check that fixed and movable
transport plates are tightly
fastened.
Lubricate rollers if needed
Check the automatic width
adjustment; re-set if neces-
sary.
Grease the spindles und
guides, see „Lubricating the
spindles and travel guides -
AXI“ (Page 188).
approx. 20
min.
Sensor head Check the camera connections. Approx.
5min.

Maintenance
Maintenance schedule
176
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
Yearly maintenance
Component Measures Time
required
System Perform these steps:
Check cables in all the cable
guides for abrasion, correct
positioning and placement;
replace if necessary.
Check the signal lamp func-
tion.
approx. 15-
30 min.
Transport system Check the light barriers /
sensors and end switch.
Approx.
10 min.
Positioning unit Check magnets for damage. approx. 10
min.
3 yearly maintenance
Component Measures Time
required
System + external
components
Perform these steps:
Check all screws and lacquer
if required.
Check all control modules;
clean outside, inside if neces--
sary.
approx. 10
min.
X-ray tube Replace the battery, see
„Exchanging the battery“ (Page
220). After re-installing the X-
ray tube carry out a geometric
calibration.
approx. 15
min.
Approx. 6 hr.
X-ray tube Check whether the sealed tube
should be reconditioned, see
„Reconditioning of sealed X-ray
tube“ (Page 222)
approx. 8 hr.