X7056_Operating manual_en.pdf - 第176页

Maintena nce Maintenance sc hedule 176 Inspection system X7056 | Operating manual | Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a Yearly maintenance Component Measures Time required Syst e m P erform these steps:  Chec…

100%1 / 280
Maintenance
Maintenance schedule
175
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
Half-yearly maintenance
Component Measures Time
required
System Perform a geometric calibration. approx. 6 hr.
XM sensor head, XM 3-D
camera technology
See „Maintaining the XM 3D
camera technology“ (Page 227)
approx. 5-
10 min.
Transport belts AOI Perform these steps:
Check the transport belts for
abrasion and damage.
Inspect the transport belts
and replace if necessary, see
„Exchanging the AOI trans-
port belts“ (Page 200).
approx. 5
min.
approx. 15
min.
approx. 1 hr..
Transport belts AXI Perform these steps:
Check the transport belts for
abrasion and damage.
Inspect the transport belts
and replace if necessary, see
„Exchanging the AXI trans-
port belts“ (Page 210).
approx. 5
min.
approx. 15
min.
approx. 1 hr..
Z-Axis Inspect the belt and replace if
necessary. The belt must be
exchanged by Viscom
personnel.
approx. 1 hr.
Transport system AOI Perform these steps:
Check that fixed and movable
transport plates are tightly
fastened.
Lubricate rollers if needed
Check the automatic width
adjustment; re-set if neces-
sary.
Grease the spindles und
guides, see „Lubricating the
spindles and travel guides -
AOI“ (Page 186).
approx. 20
min.
Transport system AXI Perform these steps:
Check that fixed and movable
transport plates are tightly
fastened.
Lubricate rollers if needed
Check the automatic width
adjustment; re-set if neces-
sary.
Grease the spindles und
guides, see „Lubricating the
spindles and travel guides -
AXI“ (Page 188).
approx. 20
min.
Sensor head Check the camera connections. Approx.
5min.
Maintenance
Maintenance schedule
176
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
Yearly maintenance
Component Measures Time
required
System Perform these steps:
Check cables in all the cable
guides for abrasion, correct
positioning and placement;
replace if necessary.
Check the signal lamp func-
tion.
approx. 15-
30 min.
Transport system Check the light barriers /
sensors and end switch.
Approx.
10 min.
Positioning unit Check magnets for damage. approx. 10
min.
3 yearly maintenance
Component Measures Time
required
System + external
components
Perform these steps:
Check all screws and lacquer
if required.
Check all control modules;
clean outside, inside if neces--
sary.
approx. 10
min.
X-ray tube Replace the battery, see
„Exchanging the battery“ (Page
220). After re-installing the X-
ray tube carry out a geometric
calibration.
approx. 15
min.
Approx. 6 hr.
X-ray tube Check whether the sealed tube
should be reconditioned, see
„Reconditioning of sealed X-ray
tube“ (Page 222)
approx. 8 hr.
Maintenance
Lubricating the runner blocks - AOI
177
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
Lubricating the runner blocks - AOI
To ensure smooth functioning of the transport system, the posi-
tioning units and the width adjustment, grease the guide carriages
regularly.
The following sections describe how to lubricate the runner blocks:
Transport system AOI
Lubricating the AOI runner blocks
Transport system AOI
The following illustration indicates the position of the runner blocks
to be lubricated in the AOI transport section of the inspection
system:
AOI runner block
Grease the runner blocks in the AOI section through the 6M funnel
grease nipples.
Legend
Name Size Numbe
r
Grease in cm
3
Rexroth standard runner block
R1622 (steel)
25 8 1.4
Y
X