X7056_Operating manual_en.pdf - 第245页
Packing Packing the inspection system 245 Inspection system X7056 | Operating manual | Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a Wrapping the inspection system Precondition: Signal l amp is re moved. The system …

Packing
Packing the inspection system
244
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
Transport clamps
Fastening the
inspection
system to the
pallet
Required: 4 transport clamps with 8 hex head wood screws (10 x 60)
Cordless screwdriver
Perform the following work steps:
1. Set one of the transport clamps around a system foot.
2. Screw down the transport clamp securely to the pallet.
The first transport clamp is fastened.
3. Repeat steps 1 and 2 for the other machine feet, see .„Inspec-
tion system fastening points“ (Page 243)
The inspection system is fastened to the pallet.

Packing
Packing the inspection system
245
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
Wrapping the inspection system
Precondition: Signal lamp is removed.
The system is cleaned.
The inspection system is fastened to the pallet with transport
clamps.
Required: Bubble wrap and plastic stretch wrap
Aluminum laminate sheet and bag
Packing tape
Drying agent
Cordless screwdriver
Vacuum cleaner
Foil sealer
Placing the
drying agent
Perform the following work steps:
Place a sack of drying agent beneath the inspection system.
The drying agent is placed.
Wrapping the
inspection
system with
foil.
Perform the following work steps:
1. Wrap the monitor bracket with bubble wrap.
2. Fasten the bubble wrap with packing tape.

Packing
Packing the inspection system
246
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
3. Place a layer of bubble wrap over the inspection system.
The front and rear sides of the inspection system are covered
with bubble wrap.
4. Completely wrap the inspection system with bubble wrap.
5. Fold in the monitor bracket.
6. Set the accessories cartons to the front and on the side of the
inspection system.
7. Completely wrap the system with two layers of stretch wrap.
The inspection system is wrapped with bubble wrap and stretch wrap.