X7056_Operating manual_en.pdf - 第247页
Packing Packing the inspection system 247 Inspection system X7056 | Operating manual | Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a Pac k i ng t h e inspection system airtight Perform the following work steps: 1. C omp…

Packing
Packing the inspection system
246
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
3. Place a layer of bubble wrap over the inspection system.
The front and rear sides of the inspection system are covered
with bubble wrap.
4. Completely wrap the inspection system with bubble wrap.
5. Fold in the monitor bracket.
6. Set the accessories cartons to the front and on the side of the
inspection system.
7. Completely wrap the system with two layers of stretch wrap.
The inspection system is wrapped with bubble wrap and stretch wrap.

Packing
Packing the inspection system
247
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
Packing the
inspection
system airtight
Perform the following work steps:
1. Completely cover the inspection system with the aluminum
laminate bag.
2. Heat-seal the aluminum laminate bag to the bottom layer of
aluminum laminate on the wooden pallet.
Leave an opening of approx. 5 cm for pumping out the air.
3. Insert the vacuum cleaner hose into the opening and remove
the air from the foil laminate bag.
The air is completely pumped out.
4. Remove the vacuum cleaner hose.
5. Heat-seal the opening with the foil sealer.

Packing
Packing the inspection system
248
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
6. Affix the transport indicators, see „Transport indicators“ (Page
59).
7. Completely wrap the system with two layers of stretch wrap.
The inspection system is wrapped airtight.
Completed. The inspection system is wrapped.
Packing the inspection system in the transport case
For overseas transport, Viscom recommends having the inspection
system packed in a suitable transport case by an industrial packing
company.
NOTE
To prevent improper lifting and transporting, mark the center of
gravity on the transport case according to the center of gravity
sketches, see „Center of Mass“ (Page 260).
Transporting the inspection system
Before beginning to transport the system, read and understand the
accompanying transport manual.