Installation Mechanical installation 69 Inspection system X7056 | Operating manual | Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a Mechanical installation In this section, the mechanic al installati on is descr ibed. Th…

Installation
Safety
68
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
Safety
Follow these instructions when installing the system:
The inspection system must stand on a flat, even, horizontal
surface.
The setting conditions must be met, see „Setting conditions“
(Page 69).
The mechanical and electrical installation may only be done by
trained specialists or by Viscom AG service technicians.
A minimum free space of 1 m in front of and behind the inspec-
tion system is required for installation work.
All supply lines must be laid or hung so that the operation of
the system is not hindered, no cause of stumbling exists, and
the required minimum clearance is observed.
The system may not be operated with a disconnected PE safety
conductor under any circumstances, see „Checking the safety
conductor PE“ (Page 80).
The contact current in the inspection system is more than
3.5 mA. In addition to the safety conductor PE a separate
ground/earth connection attached to the PE clamp is manda--
tory, see „Connecting FE (TE)“ (Page 80).
Immediately after the setup work is finished, check all safety
features.
The protective features installed by the Viscom AG may not be
altered, bypassed or disabled in any way.

Installation
Mechanical installation
69
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
Mechanical installation
In this section, the mechanical installation is described.
The work steps in detail:
Setting the inspection system (Page 69)
Removing the transport locks from the AOI section (Page 71)
Removing the transport locks from the AXI section (Page 73)
Installing the signal lamp (Page 75)
Level the housing to horizontal (Page 76)
Setting the inspection system
This section describes how to set the inspection system.
These safety requirements and work steps are explained:
Setting conditions (Page 69)
Transporting the inspection system to the usage site (Page 70)
Setting conditions
This section contains basic information for setting the inspection
system.
The setting conditions are divided into:
Operating conditions
Space requirements
Operating
conditions
For unpacking, use a sufficiently large surface that is protected
from moisture.
The inspection system must stand on a flat, even, horizontal
surface. The surface must be firm enough to prevent vibration
during system operation.
Operating conditions
Permissible weight load for the
ground surface
950 kg/m
2
Permissible weight load for the
ground surface (per system foot)
39 N/cm
2
Ambient temperature 5°C to 35°C
Humidity to 80%, not condensed
Average humidity <60%

Installation
Mechanical installation
70
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
Space
requirements
A minimum free space of 1 m on the sides of and behind the
inspection system is required for installation and maintenance
work.
Free space on the sides is not required, because the system is
integrated into a production line.
Setting the inspection system at its final usage site
This section describes how to set the inspection system. After they
are set, they can be installed..
The work steps in detail:
Transporting the inspection system to the usage site (Page 70)
Leveling the inspection system to the line (Page 70)
Transporting
the inspec-
tion system to
the usage site
Precondition: The setting conditions are met, see „Setting conditions“ (Page
69).
The industrial truck requirements are met, see„Delivery“ >
„Transport with industrial trucks“ (Page 57).
Perform the following work steps:
1. Position the industrial truck to the rear of the inspection
system.
2. Lift the inspection system carefully; pay attention to the
weight, the center of gravity and tipping angle.
3. Transport the inspection system to its final usage site.
The inspection system is at the final usage site.
Leveling the
inspection
system to the
line
Perform the following work steps:
1. Lower the inspection system carefully with the help of the
industrial truck.
2. When lowering the system, verify that the fixed front transport
side plate is in line with the production line.