X7056_Operating manual_en.pdf - 第74页
Installation Mechanical installation 74 Inspection system X7056 | Operating manual | Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a ATTENTION Damage to the inspection system Unsecured transport axes may ca use damage dur…

Installation
Mechanical installation
73
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
Removing the transport locks from the AXI section
The transport locks prevent movement of the axes during trans-
port. Remove the transport locks before installation.
The following sections describe how to remove the transport
system locks:
Overview
Removing the transport locks
Overview
Transport locks AXI section
Removing the
transport
locks
Required:
Allen (hex) keys (5 and 6 mm)
NOTICE
Store the transport locks for later use.
Legend
No. Name Description
1 Transport lock, AXI section Secures the AXI transport track.
2 Transport lock, AXI section Secures the AXI transport track.
1
2

Installation
Mechanical installation
74
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
ATTENTION
Damage to the inspection system
Unsecured transport axes may cause damage during transport.
Only remove the transport locks when the system is at its final
installation site.
Perform the following work steps:
1. Open the rear swing doors.
Access to the AXI section is open.
2. Remove the four screws of the first AXI transport lock (6 mm
hex key).
3. Remove the first AXI transport lock.

Installation
Mechanical installation
75
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
4. Remove the two screws of the second AXI transport lock (6 mm
hex key).
5. Remove the second AXI transport lock.
The AXI transport locks are removed.
Installing the signal lamp
Perform the following work steps:
1. Take the signal lamp light elements out of the accessories
carton.
2. Set the light element into the signal lamp socket.
3. Turn the light element carefully into its socket until it locks.
4. Complete steps 1 to 3 for the X-ray signal lamp also.
The signal lamps are installed.