X7056_Operating manual_en.pdf - 第80页
Installation Electrical inst allation 80 Inspection system X7056 | Operating manual | Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a Checking the safety cond uctor PE DANGER Electrical shock Danger to life fr om disconne…

Installation
Electrical installation
79
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
The inspection system is properly set in place.
NOTICE
Each system must be assigned a separate leakage circuit breaker.
DANGER
Electrical shock
Danger to life from improper conduct.
Before all electrical work, make sure that:
the main power supply is disconnected and
the system is protected from accidental switching-on.
CAUTION
Danger of tripping
Injury due to improperly laid cable.
When laying the cable, make sure there are no kinks, places to
trip or tangles.
Perform the following work steps:
1. Open the rear swing doors of the inspection system.
2. Take the connection cable with the CEE plug.
3. Connect the inspection system to the main electrical power
supply.
The standard connection is done.

Installation
Electrical installation
80
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
Checking the safety conductor PE
DANGER
Electrical shock
Danger to life from disconnected safety conductor.
The safety conductor must be connected to prevent electrical
shock.
The system may not be operated with a disconnected safety
conductor under any circumstances.
Perform the following work steps:
1. Open the front door.
2. Open the pivoting frame, see „Open the pivoting frame“ (Page
87).
3. Make sure that the safety conductor is properly connected.
The safety conductor is checked.
Connecting FE (TE)
NOTICE
The FE (TE) connection improves electromagnetic compatibility
(EMC).
Perform the following work steps:
1. Open the front door.
2. Open the pivoting frame, see „Open the pivoting frame“ (Page
87).
3. Connect a flexible conductor with a minimum cross section of
10 mm
2
, which is connected to the potential equalization point.

Installation
Electrical installation
81
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
4. Latch the front door.
FE (TE) is connected.
Check motor overload switch settings (Q1EA)
Perform the following work steps:
1. Use the current circuit diagram to make sure that the fuses
correspond to the input voltage.
2. Adjust the settings, if required.
The motor overload switch is adjusted.