Installation Integrating the i nspection system into the lin e 85 Inspection system X7056 | Operating manual | Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a 5. Adjust the height of the inspection system by tuning its fe…

Installation
Integrating the inspection system into the line
84
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
System feet
Adjusting the height of the inspection system
Required: 30 mm open-end wrench
Perform the following work steps:
1. Loosen the lock nuts on the system feet.
The feet can now be turned in or out by their lower bolts.
2. Place a PCB in the inspection system transport track.
3. Place the second PCB in the production line conveyor.
4. Slide the PCBs toward each other until they almost touch at the
transition between system and production line (see illustration).
The edges of the PCBs are parallel to each other.
Lock nut
Screw

Installation
Integrating the inspection system into the line
85
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
5. Adjust the height of the inspection system by tuning its feet in
or out.
The PCBs are on the same height.
The height of the inspection system is adjusted.
Leveling the inspection system to horizontal
Precondition: The inspection system is properly set in place, see „Setting the
inspection system“ (Page 69).
Required: Two PCBs
Two 30mm open end wrench
Carpenter's level
NOTICE
It is also possible to work with two levels at the same time. Set
one level on the x-axis and the other on the y-axis of the posi-
tioning unit and level the system.
WARNING
Hazard of injury
The positioning unit contains strong permanent magnets.
Be careful with the level near the permanent magnets when
leveling the system.
Make sure that the level does not come in contact with the
permanent magnets.
Perform the following work steps:
1. Open the front lift door.
The system interior is open.
2. Set the level on the x-axis of the positioning unit (AOI X).
3. Set the inspection system in a horizontal position as indicated
by the level by turning in or out the housing feet.
The level indicates whether the system is horizontally level.
4. Set the level on the y-axis of the positioning unit (AXI Y).
5. Set the inspection system in a horizontal position as indicated
by the level by turning in or out the housing feet.
The level indicates whether the system is horizontally level.
6. If necessary, repeat steps 2 to 5, until the system is horizon-
tally levelled.

Installation
Integrating the inspection system into the line
86
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
7. Fasten the lock nuts of the housing feet with an open-end
wrench while re-tightening the screws with a second open-end
wrench.
The inspection system is horizontally level.
Adjusting the transport track width
WARNING
Hazard of injury
Crushing of the hand from movement of the transport track.
Do not reach into the transport track when adjusting the width.
Perform the following work steps:
1. Open the front lift door.
The rotary knobs for manual width adjustment of the AOI (1)
and AXI (2) transport track widths are located toward the front.
2. Adjust the transport track width:
Make sure that there is a 0.5 to 1 mm clearance between the
transport track and printed circuit board.
3. Press and turn the pressure knob clockwise to increase the
transport track width.
4. Press and turn the pressure knob counterclockwise to decrease
the transport track width.
The transport track width is set.
(2)
(1)