SW 703 Option WPC - Checks when loading the WPC. : 122

100%1 / 200
SW 703 Option WPC - Checks when loading the WPC. :
121
Checks when loading the WPC.
The table to the left lists the key points that you should
check at the WPC when preparing a product to run at the
line.
SW 703 Option WPC - Checks when loading the WPC. :
122
SW 703 Prepare the line – Important Factors - Most Important Factors for Prepare the Line :
123
SW 703 Prepare the line – Impor tant Factors
DPM = Defects per million – a measure of how many parts are misplaced or not placed at all.
MFR = Material Failure Rate – how many PCBs fail at test.
Most Important Factors – DPM, MFR, Scrap Rate
Results – Lower Quality, Rework Costs, Higher Production Costs
Tasks that can cause quality Problems
Loading incorrect parts onto feeders / MTC
Operations Success Measures
Number of incorrect parts loaded / product start up.
Operations Target
Zero incorrect components loaded!