M6_ServiceManual_e.pdf - 第32页

3 Mechanical Section 3-2 ■ Vacuum Generator ACTION: Breakdown Visually check the silencer element, and if it is excessively dirty, replace it with a new one. Also measure the ma ximum air pressure to inspect whet her the…

100%1 / 90
3 Mechanical Section
3-1
3
Mechanical Section
3 Mechanical Section
3-2
Vacuum Generator
ACTION: Breakdown Visually check the silencer element, and if it is excessively dirty, replace it with a new one.
Also measure the maximum air pressure to inspect whether the vacuum generator can generate vacuum
properly.) Inspection for Head/Nozzle Clogging and Solenoid Valve
Inspection interval
Once a week
Part Name
Part No. Remark
SILENCER ELEMENT LG0-M71A8-00X Silencer element
GENERATOR,VACUUM LG0-M71A3-00X Vacuum generator
3 Mechanical Section
3-3
Inspection for Head/Nozzle Clogging and Solenoid Valve
Breakdown
The following inspection must be carried out approximately once a week.
Inspection of Solenoid Valve
The switching valve of the solenoid valve may catch foreign matter causing air leakage. Air leakage will
turn the suction ON even if it is turned OFF.
As a result, the suction cannot be turned OFF after a component is mounted, and components may be
returned instead of being mounted on the PCB.
Inspecting by selecting [Manual] – [Meas. Air pressure]
Checking the maximum air pressure
Turn ON the suction and press the head tip with fingers to check the air pressure. The air pressure is
satisfactory if it is “600” or higher.
Checking the head for clogging
With no nozzles placed in the head, turn ON the suction to check the air pressure. Typical air pressure is
approx. “70”. An error will occur if the air pressure is “180” or higher during vacuum check performed
after nozzle replacement.
Checking the nozzle for clogging
With nozzles placed in the head, turn ON the suction to check the air pressure. “Nozzle clog criteria” has
been set for each nozzle. The air pressure must be below the criteria. If it is not, the nozzle will be
considered to be clogged and an error will occur.
Checking the solenoid valve for switching failure
Turn OFF the suction and check for change in the air pressure.
- Press the head/nozzle tip with fingers and check for change in the air pressure.
- Turn ON and OFF the suction a few times and check for change in the air pressure.
If the air pressure changes even though the suction is OFF, air is probably leaking from the suction solenoid
valve.
NOTE: Do not disassemble the solenoid valve. Manufacturer’s guarantee will be ineffective if the solenoid valve is
disassembled.
Part Name
Part No. Remark
SOL.VALVE ASSY LC9-M71A1-10X solenoid valve assembly
SOL.VALVE LC1-M71A1-10X solenoid valve (single part)
NOTE: For official inspection, use of a digital vacuum meter is necessary to check accuracy of the displayed air
pressure value.
Part Name
Part No. Remark
MANOMETER ASSY. LG0-M89A5-00X Vacuum Gauge Set