M7_ServiceManual_e.pdf - 第10页

1 Installation 1-2 Installation of the Mounter Environmental Requirements Install the mounter at the place wh ere the below conditions are met. Do not do tasks, such as movi ng the mounter or connecti ng the mounter wit …

100%1 / 103
1 Installation
1-1
1
Installation
1 Installation
1-2
Installation of the Mounter
Environmental Requirements
Install the mounter at the place where the below conditions are met.
Do not do tasks, such as moving the mounter or connecting the mounter with the main switch ON to prevent
electric shock.
Ambient Temperature: Accuracy assurance 23 +/-2 degrees centigrade
Operation assurance 5 to 40 degrees centigrade
(The average over a period of 24 hours does not exceed 35 degrees C.)
Relative Humidity: 45 to 60 percent, non-condensing
Atmosphere: Dust and corrosive gas free
Floor: Floor must be flat and sturdy enough for freedom from vibration during
operation.
Power Requirements: 200 VAC +/- 10%, three phase, 50/60 Hz
* 200/208/220/240/380/400/416/440V VAC power transformer
Power consumption: 3.2KW(M7-3L/M7-2L)2.4KW(M7-3S)
Capacity: 12kVA(M7-3L)9kVA(M7-3S/M7-2L)
Leakage current: 6mA or less
* Power and ground the mounter independently of other machines which may be a
noise source, such as a compressor, welding machine, or reflow soldering machine
with magnetic contacts.
Warning
1 Installation
1-3
How to Hoist the Mounter
Use the wires and the arm as follows.
NOTE: Be sure to use the arm to prevent the wire from touching the mounter.
Front View
Arm
Wire
Side View
Arm
Wire