M7_ServiceManual_e.pdf - 第19页
1 Installation 1-11 C A B D Jack-up Point The four Jack-up points are determined considering the structure of M7 base face and balance ratio. M7-3L, M7-2L Bottom face of Jack-up Points; ACD . Bottom face of Jack-up Point…

1 Installation
1-10
Supplementary Explanation for Installation
When setting up a production line, level adjustment and line positioning of the mounter may be carried out
at the same time. However, to fine-adjust the mounter position with the mounter level, i-PULSE
recommends that the mounter be roughly positioned to the production line first, and then be leveled and
positioned accurately using the following four sets comprising a hydraulic jack and plates.
ACTION:
① Bond the non-slip base rubber with base plate 2.
② Apply grease between base plates 1 and 2 for lubrication purposes.
③ Place a plate set near each mounter jack-up point (four points).
④ Place a jack on each plate set and jack up the mounter.
⑤ Adjust each jack so that the mounter is level.
⑥ Fine-adjust the position of the mounter while the mounter is jacked up. (The mounter can be moved
lengthwise and crosswise with help of grease applied between the plates.)
Hydraulic jack
Base plate 1
Base plate 2
Base rubber
Apply grease
between the
p
lates.
Hook stroke

1 Installation
1-11
C
A B
D
Jack-up Point
The four Jack-up points are determined considering the structure of M7 base face and balance ratio.
M7-3L, M7-2L
Bottom face of Jack-up Points; ACD.
Bottom face of Jack-up Point B.
250 (500) 250
330
(
810
)
400
330
(
730
)
480
Front Side
Jack-up point
Two each at front and rear
Rear Side
Jack-up point
Two each at front and rear

1 Installation
1-12
B
B
A A
M7-3S
Bottom face of Jack-up Points A.
Bottom face of Jack-up points B.
NOTE: The hydraulic jacks must satisfy the following requirements.
Allowable load: 1.5 tons or higher
Hook size: 100mm or more (stroke)
Part Name
Part No. Remark
PLATE,BASE LG0-M8911-00X For plates 1 and 2
GOM,BASE LG0-M8912-00X Base rubber
190 190
310
310
Front Side
Rear Side
19300
Jack-up point
Two each at front and rear
Jack-up point
Two each at front and rear