TECHNICAL REFERENCE APPENDIX PREVENTIVE MAINTENANCE Chapter Issue 1 June 15 Appendix to Micron Technical Manuals 3.57 Daily Maintenance W ARN ING HARMFUL SUBST ANCES. CLEANING WIPES AND CLEANING SOLUTIONS MA Y CONT AIN S…

TECHNICAL REFERENCE APPENDIX
PREVENTIVE MAINTENANCE
3.56 Appendix to Micron Technical Manuals Chapter Issue 1 June 15
Summary of the Programme
The PM Plan
Daily This maintenance schedule is a recommended programme which should be
carried out on a daily basis. Tasks are generally limited to surface cleaning and
minor inspections and should take no more than fifteen minutes to complete.
Monthly This maintenance schedule is a recommended programme which should be
carried out on a month by month basis. It comprises two modules that are
designed to take approximately 2 hours each to complete.
In the first module, SPC Alignment, Machine Cycle Count, Software Checks and
a standard Monthly Maintenance Check make up the elements.
NOTE
SPC Alignment is included in the QC Calc Software package which is an
optional measurement tool.
The second element comprises the Monthly Hardware Check, each month one
or more hardware modules are scheduled for maintenance. Over a twelve
month period all machine modules are checked and serviced at least once.
Each monthly schedule, January through to December is the same no matter
where the machine resides. ASM service engineers already have maintenance
history on which modules have been serviced and those that are in need of
service. If an error occurs the precise service history is known and this could
prove useful in tracking a fault condition.
Daily Schedule
Approximately 15 Minutes
Approximately 4Hours
SPCAlignment Check
(where available)
2Hours
Software Check
Monthly Maintenance Check
Machine CycleCount
2Hours
Monthly Hardware Check
Monthly Schedule

TECHNICAL REFERENCE APPENDIX
PREVENTIVE MAINTENANCE
Chapter Issue 1 June 15 Appendix to Micron Technical Manuals 3.57
Daily Maintenance
WARNING
HARMFUL SUBSTANCES. CLEANING WIPES AND CLEANING SOLUTIONS MAY
CONTAIN SUBSTANCES HAZARDOUS TO HEALTH. OBSERVE ALL
MANUFACTURERS’ HEALTH AND SAFETY GUIDELINES. ALWAYS WEAR
APPROVED PROTECTIVE CLOTHING WHEN CLEANING THE MACHINE.
WARNING
BOARD CLAMPS. EXTREME CARE MUST BE EXERCISED WHEN WORKING IN
THE TOOLING AREA OF THE MACHINE TO AVOID INJURY. THE FOILS ON THE
FRONT AND REAR BOARD CLAMPS ARE VERY SHARP.
Preparation The machine must be isolated from electrical power and air pressure. Remove
the stencil if fitted.
General
SEMI Level No Task Tools Completed Reference Figure
1 Inspect the following linear bearings
for contamination:
a. Camera Carriage
b. Paste Dispenser
c. Print Carriage
d. Rising Table
e. Transport Rails
NOTE
Refer to Cleaning and Lubrication -
Linear Bearings and Guide Rails, ear-
lier in the chapter.
Spatula, THK
AFB Grease
Camera System
Paste Dispenser
Print Carriage
Rising Table
Rail System
2 Inspect the following ballscrews for
contamination:
a. Rising Table
b. Transport Rails
NOTE
Refer to Cleaning and Lubrication -
Rising Table and Transport Rail
Ballscrews, earlier in the chapter.
Spatula, THK
AFB Grease
Rising Table
Rail System
3 Paste Dispenser:
Remove any debris and clean the drip
tray.
Spatula,
IPA Impreg-
nated Wipes
Paste Dispenser
4 Screen Change Mechanism:
a. Auto Drip Tray
b. Auto Drip Tray Actuator Pistons
Remove any debris and clean.
Spatula,
IPA Impreg-
nated Wipes
Screen Change Mechanism
5 Adjustable Screen Mount (ASM):
a. ASM Assembly
b. Pulley Assemblies
c. Stencil Guide Strips
Remove any debris and clean.
Spatula,
IPA Impreg-
nated Wipes
Adjustable Screen Mount
(ASM)
SEMI 1
SEMI 1
SEMI 1
SEMI 1
SEMI 1

TECHNICAL REFERENCE APPENDIX
PREVENTIVE MAINTENANCE
3.58 Appendix to Micron Technical Manuals Chapter Issue 1 June 15
6 Camera:
a. Up and down camera lens
b. Board at stop opto
Remove any debris and clean.
Spatula,
IPA Impreg-
nated Wipes
Board Opto Locations
7 Underscreen Cleaner:
a. Linear Bearings
b. Magnet Assemblies
Remove any debris and clean.
Spatula,
IPA Impreg-
nated Wipes
Underscreen Cleaner
8 Board Optos:
Clean the top of the board at left,
board at right, left auxiliary conveyor
and the right auxiliary conveyor sen-
sors.
Spatula,
IPA Impreg-
nated Wipes
Board Opto Locations
9 Tooling:
Remove any debris and clean.
Spatula,
IPA Impreg-
nated Wipes
Rising Table
10 Rising Table:
a. Manual tooling plate of the rising
table
b. Clatter bars
Remove any debris and clean.
Spatula,
IPA Impreg-
nated Wipes
Lint-free cloth
Rising Table
Rail System
11 Machine Covers:
Remove any debris and clean.
NOTE
1. Use only soap and water on the
machine viewing panels.
2. If the front left hand corner panel
has been removed for cleaning,
carry out an EMO functional check
on completion of the daily mainte-
nance.
Spatula,
IPA Impreg-
nated Wipes
Machine Covers
Estimated time required for daily tasks 15.0 mins
SEMI Level No Task Tools Completed Reference Figure
SEMI 1
SEMI 1
SEMI 1
SEMI 1
SEMI 1
SEMI 1