Inspected on Month Date Year Installation Check List (3/4) Document Ver. 1.00 Customer name: Target model: Modular CM602-L Production code: Software Ver. 1. Purpose: Check that there is no problem with M/C operation by c…

Inspected on Month Date Year
Installation Check List (2/4) Document Ver. 1.00
Customer name:
Target model: Modular CM602-L
Production code:
Software Ver.
1. Purpose: Check that there is no problem with M/C operation by checking the following items at the time of installation.
2. Judgment: Circle the "OK" for each column after inspection or adjustment check.
Serial No. Serial No.
No. Checking points
Check result Check result
5
Check the voltage connection label. (Turn off the user's primary power.)
* Check that factory supply voltage is aligned with the q position.
6 Check the 3-level status indicator for secureness.
* Be careful not damage the machine roof, etc. when installing or fixing the indicator in pl
a
* Secure the cable with cable ties.
7
Measure voltage and resistance. (User's primary power: ON, Machine:OFF)
* Visually check the terminal-block ground line (PE) is connected to the factory ground.
* Check that no voltage is applied to the ground with a tester.
PE - Machine frame: 0V
PE - Reference ground, Iron bar: 10 w or less
8
Measure primary voltage.
(M/C power: ON) Circle the supply voltage.
Measure voltage.
L1 - L2
E - L1 E - L2 E - L1 E - L2
L2 - L3
Spec. voltage:
( V) ( V) ( V) ( V)
L3 - L1 +/-10V
E - L13 L1- L2 E - L3 L1- L2
(Red) (Black) ( V) ( V) ( V) ( V)
L2 - L3 L3 - L1 L2 - L3 L3 - L1
* Check powering-up. ( V) ( V) ( V) ( V)
(Check the machine for booting-up and the booting screen is displayed.)
9
Measure DC5V (5.05 - 5.10V)
( V) ( V)
voltage. DC12V Record the measured value.
( V) ( V)
DC12V Record the measured value.
( V) ( V)
P12-A (12.90 - 13.00V)
( V) ( V)
P24-A (24.80 - 25.00)
( V) ( V)
* P24-1 is adjusted with Stage-B power-box RF2 VR.
P12-B (12.90 - 13.00)
( V) ( V)
* P12-1 is adjusted with Stage-B power-box RF2 VR.
P24-B (24.80 - 25.00)
( V) ( V)
Measured
valu
e
Measured
valu
e
Measured
valu
e
Measured
valu
e
Measured
valu
e
Measured
valu
e
Measured
valu
e
Measured
valu
e
Measured
valu
e
Measured
valu
e
Measured
valu
e
OK
OK
OK
OK
OK
OK
OK
OK
CPU box
DC power
unit
OK
Measured
valu
e
Measured
valu
e
Measured
valu
e
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK OK
OK
* Supply voltage: 3 phases: 200, 220, 380, 400, 420, 480V
Check the user's primary power and
voltage and check that the label
position is matched with the supply
voltage.
Check the setting of the machine
transformer.
Signal cables (CN00, 01) should not be connected.
Red
Blk.
□お客様控え
EJM8A-J-SMA020103-A01-00
パナソニックファクトリーソリューションズ株式会社
Page 2-1-3-34
F3A0016-03A

Inspected on Month Date Year
Installation Check List (3/4) Document Ver. 1.00
Customer name:
Target model: Modular CM602-L
Production code:
Software Ver.
1. Purpose: Check that there is no problem with M/C operation by checking the following items at the time of installation.
2. Judgment: Circle the "OK" for each column after inspection or adjustment check.
Serial No. Serial No.
No. Checking points
Check result Check result
9
Measure
* P24-2 is adjusted with Stage-A power-box RF2 VR.
voltage.
RF - IPF (12.02 - 12.10V)
RF - IPR (12.02 - 12.10V)
10 Check the vacuum pump for rotation direction. (Check it is vacuumed.)
* If blow is applied, change the primary-power cable.
11 Check air pressure. (When M/C stops, 0.49MPa - 0.54MPa)
12 Check the air pressure switch is set to 0.45MPa.
13
14 Check the servo switch for function. One for each side: front and rear
15
Check the M/C cover switch. (One for each side, Transfer section, Extension conveyor cover OP)
16 Check the tape-float sensor for detection. (4 locations)
17 Check the width-adjustment interlock for detection.
(2 locations)
18 Check the support change interlock for function. (2 locations)
19
20 Check operation-side change. (F and R)
21 Set the recognition-error-judging value. (Set value: 85%)
22 Check saving to a floppy disk and uploading from it.
23 Check the connection cables (SEMEMA) CN00 and CN01 for connection.
24 Check the HUB power and communication cable for connection. (Option)
25 Check PT communication. (Uploading data from PT to M/C. Saving)
To remove a PT comm. error, upload the network configuration from the M/C parameter FD.
26
Check the vacuum-sensor value for each head. (Check sensor function.)
27
28 Correct the mounting positions. (M/C parameters)
(Specifications: CPK1.33 or more) St A F,R
* Placement verifications Target CPK: 1.5 or more St B F,R
(Range: High-speed: 1005 +/-0.05, 0603: +/-0.05, St A F,R
Multi-purpose QFP +/-0.035) St B F,R
If the CPK value does not satisfy the specifications after mount position
teaching, perform teaching again.
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
( V)
( V)
OK
OK
OK OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
AR
BF
BR
AF
AR
BF
BR
AF
OK OK
OK
Check the emergency stop switch for function. One for each side: front and rear
Color
-
touch
power
Measured
valu
e
Measured
valu
e
Measured
valu
e
Measured
valu
e
( V)
OK
OK
( V)
OK
OK
No. of times
of teaching
OK
Set "System parameter - Screen output to MC" to "Unuse."
OK
OK
OK
OK
OK
OKCheck the nozzle changer for the recognition-hole positions.
(The fiducial mark should cover 1/3 of the cross line.)
* The pickup sensor values for all nozzles should change on the "Axis Info"
screen every time vacuum is turned ON/OFF on the "Output" screen.
* Vacuum value should not be different largely among nozzles.
ST
CPK X
Y
[Direct]
[Shadow]
Times
Times
[QFP]
X
Y
X
Y
X
Y
Customer's copy
EJM8A-E-SMA020103-A01-00
Panasonic Factory Solutions Co., Ltd.
Page 2-1-3-35
F3A0016-03A

Inspected on Month Date Year
Installation Check List (4/4) Document Ver. 1.00
Customer name:
Target model: Modular CM602-L
Production code:
Software Ver.
1. Purpose: Check that there is no problem with M/C operation by checking the following items at the time of installation.
2. Judgment: Circle the "OK" for each column after inspection or adjustment check.
Serial No. Serial No.
No. Checking points
Check result Check result
29 Carry out Pickup position and Pickup height teaching.
(High-speed 130 nozzle, Multi-functional 1003 nozzle, Pickup jig)
30
Check the tape cutters on all stages for cutting.
31
Check the nozzle changer for operation. (10 min. for each stages)
32
Check board transfer. (User's boards), Check signal to/from non-Panasonic M/C.
33
Check board transfer. (User's boards), Check signal to/from non-Panasonic M/C.
34
35 Save the machine parameters.
(Be sure to save them when delivering the machine to the customer.)
36 Check that the machine foot plates are seated securely. (6 plates)
Check, hitting the foot plates lightly with a 46 wrench.
1KJZ 1KJZ
1 Check voltage. DC5V V1 - G1 (5.05 + 0.03V)
DC12V V2 - G2 (12.00 +/- 0.1V)
DC24V V4 - G4 (24.00 - 24.30V)
2 Check ST40 operation.
3
4
5
6
7
8 Check CM602 and ST40S for operation. (Test run: 15 min.)
OK
OKOK
ST40S-20 (Option)
Measured
valu
e
Measured
valu
e
Measured
valu
e
Measured
valu
e
Measured
valu
e
Measured
valu
e
( V)
( V)
( V)
OK
Serial No. Serial No.
OK
OK
OK
OK
OK
OK
OK OK
( V)
( V)
( V)
OK
OK
OK
OK
OK
OK OK
OK
OK OK
OK
Sign the Delivery label of the machine. (Representative's name)
Check position of pickup and delivery. (Shuttle and tray teaching)
Secure the CM602 to ST40 connection cable. Do not lose the short plug.
OK
OK
OK
OK
OK
OK
OK
Check the tray stops when the emergency stop switch is pressed.
The tray should not move with the servo switch off.
Check warning when the magazine door, the supply section or the pickup section is op
e
With the shutter closed, gap between palette and shutter should be 0.1 to 0.2 mm.