00198076-01_JC_PM_WF1_TX_EN - 第4页
www.asm-smt.com Table of Contents

www.asm-smt.com
Introduction
Safety Introduction
Equipment required for Workflow 1 Maintenance TX-Series
1 Remove tables (COT) and exchange nozzles
2 Empty and clean nozzle reject bin
3 Cleaning the Z-Axis C&P20 P
4 Check and clean the magnetic surfaces of X- and Y-Axis
5 Clean conveyors, lifting tables, gantry cables
6 Clean feeder modules and cut the tapes
7 Return the tables (COT)
8 Check the cover fans
9 Check filter disc: C&P20 P
10 Check nozzle seating: CPP and C&P20 P
11 Endurance run
Table of Contents

www.asm-smt.com
Table of Contents

www.asm-smt.com
Introduction
To ensure that your SIPLACE TX is always in perfect condition for use in your production environment, the machine should be maintained on a regular basis. In order to
optimize the "Uptime" for each maintenance interval four workflows have been defined combining the individual steps to form an efficient sequences of tasks to be per-
formed. All workflows are explained in detail and illustrated with clear diagrams.
Maintenance workflows
Each workflow is supported with a document (job card), which guides you efficiently through the maintenance work. The Job Card at hand covers the tasks and se-
quence for workflow 1.
– Workflow 1: Weekly maintenance tasks.
– Workflow 2: Combination of weekly and 3-monthly maintenance tasks.
– Workflow 3: Combination of weekly and 6-monthly maintenance tasks.
– Workflow 4: Combination of weekly and 12-monthly maintenance tasks.
Planning workflows
Example for the frequency of individual workflows over a period of one year.
– Workflow 1: 45 times / year
– Workflow 2: 4 times / year
– Workflow 3: 2 times / year
– Workflow 4: 1 time / year