00196626-06_AI_Portalmodularitaet_SX12_de_en - 第110页
Fitting the Gantry Final Wo rk Modifi cation s in SIPLAC E Pro 110 Gantry Modularity Portalmodularität Configuration of head, came ras, nozzles and tables Recipes / Jobs If existing recipes and jobs should be used in the…

Fitting the Gantry
Modifications in SIPLACE Pro Final Work
Gantry Modularity Portalmodularität 109
Setups
The new gantry configuration of the station configuration is used automatically when new setups are cre-
ated
If the existing Setups should be used in the future then each setup must be changed to match the gantry
configuration.
Modification of gantry configuration in the respective setup.
Location 2 can be configured afterwards.
The respective head, cameras, nozzles and tables at location 2 has to be edited.

Fitting the Gantry
Final Work Modifications in SIPLACE Pro
110 Gantry Modularity Portalmodularität
Configuration of head, cameras, nozzles and tables
Recipes / Jobs
If existing recipes and jobs should be used in the future then all of them have to be re-optimized with the
new gantry configuration.

Fitting the Gantry
Modifications in SIPLACE Pro Checklist
Gantry Modularity Portalmodularität 111
3.7 Checklist
► Put this check list in the machine logbook.
Gantry fitted (upgrade)
Step Action Who?
1 Gantry fitted? Customer in line with assembly
guide
2 Is the CPP head fitted in the correct position? Customer in line with assembly
guide
3 Are the correct end position buffers fitted? Customer in line with assembly
guide
4 Has the trailing cable been fitted correctly? Customer in line with assembly
guide
5 Does the trailing cable run parallel? Customer in line with assembly
guide
6 Is the gantry coding correct? Customer in line with assembly
guide
7 Is the stationary camera (optional) fitted? Customer in line with assembly
guide
8 Are the camera connections connected to Box PC? Customer in line with assembly
guide
9 Has the nozzle changer been fitted? Customer in line with assembly
guide
10 Is the reject bin fitted? Customer in line with assembly
guide
11 Have all tools been removed from the machine? Customer in line with assembly
guide
12 Are the doors screwed? Customer in line with assembly
guide
13 Is the machine switched on and ready for operation? Customer in line with assembly
guide
14 Have all calibration steps been performed? Customer in line with assembly
guide
Date Signature