00198596-02_JC_3M_C - 第4页

www.asm-smt.com Table of Contents

100%1 / 62
www.asm-smt.com
Equipment required for C&P20 P2/M3 head maintenance (3-monthly)
1 Mount the C&P20 P2/M3 head
2 Remove the holding circuit / orifice plate
3 Clean the return unit
4 Clean the Z-axis
5 Clean / lubricate the Z-axis linear guide
6 Clean / lubricate the DP linear guide
7 Clean / lubricate the DP drive bearing
8 Clean / lubricate the race way and clean the Z-axis jaw and light barrier
9 Clean the DP deflection area
10 Replace the filter disks
11 Mount the holding circuit / orifice plate
12 Clean the component sensor
13 Check / replace the hose for the exhaust air
14 Finishing the head maintenance
15 Appendix: Maintain the holding circuit
16 Appendix: Maintain the aperture ring
17 Appendix: Prepare the multipette
18 Appendix: Clean-up the multipette
Table of Contents
www.asm-smt.com
Table of Contents
www.asm-smt.com
Equipment required for C&P20 P2/M3 head maintenance (3-monthly)
Overview of C&P20 P2/M3 Parts
1. Connector to the interception circuit of the vacuum pump (Screwed joint cpl. /
CP20 P2)
2. Adapter board (under the cover):
C&P20P2: Adapter board C&P20 P2 (03134908-xx)
C&P20M3: Adapter board CP20P2 M3 (03214235‑xx)
3. Handle
4. Fan
5. Star motor
6. 20x DP drive
C&P20P2: DP drive CP20P cpl. (03102532‑xx)
C&P20M3: DP drive CP20M2 (03153682‑xx)
7. Star with nozzles, holding circuit and silencer
8. BE-Sensor (03126608-xx)
9. Pressure regulator valve (03136795-xx)
10. Z-motor (linear drive)
11. Return unit cpl. CP20 P2 (03128518-xx)
 CAUTION!
The PRV introduced with the C&P20 P2 is not to be cleaned.
.