ASM ProcessLens Single-lane 03/2020 Edition
42
3.14.1 Check the function of the conveyor motor
Requirements:
● Machine is switched on.
● Circuit board is placed at the beginning of the machine.
Figure 3-45: Diagnostic page
1. Go to the diagnostic page.
2. Click on the tab "Unit function".
3. Go to the section "Conveyor".
4. Click the button "PCB In" and the button "PCB Out".
5. If the circuit board cannot move through the machine the conveyor system needs to be
adjusted.
3.15 Changing the width adjustment belt
Requirements:
● Machine is switched off.
● Tension meter.
Key:
1) Tension ring
2) Screw A
3) Screw B (2 x)
4) Belt
5) Motor
Figure 3-46; Motor for the width adjustment

ASM ProcessLens Single-lane 03/2020 Edition
43
1. Loosen the tension ring by loosen the screw A (2).
2. Remove the motor by loosen the screws B (3) using an Allen key size 3.
3. Remove the belt (4) and replace it with a new one.
3.15.1 Assembling of the width adjustment belt
Requirements:
● Machine is switched off.
● Tension meter.
● Tension ring is loosened.
● Inspection circuit boards (2 x).
Key:
1) Tension ring
2) Screw A
3) Screw B (2 x)
4) Width adjustment belt
5) Motor
Figure 3-47: Motor of the width adjustment
1. Put the width adjustment belt (4) in position.
2. Place the two inspection circuit boards between the two conveyor systems.
Figure 3-48: Machine
Key:
1) Position of the inspection circuit boards

ASM ProcessLens Single-lane 03/2020 Edition
44
NOTICE
Alignment of the conveyor units
The distance between the two conveyor units need to allow the inspection circuit boards
to pass through with ease. For that the width of the conveyor units need to be parallel to
each other. The inspection circuit boards help to achieve the alignment of the conveyor
units.
3. Fasten the tension ring (1).
4. Check whether the boards can move through the conveyer systems with ease. If not adjust the
width adjustment belt.
Key:
1) Measurement
point for the
tension
Figure 3-49: Width adjustment belt
5. Check the tension of the width adjustment belt at the measurement point using a tension meter.
6. The tension should be 60 +/- 6 Hz.
3.15.2 Adjusting the width adjustment belt
Requirements:
● Machine is switched off.
● Tension ring is loosened.
● Inspection board (2 x).
1. Find out which end of the conveyor unit needs to be adjusted.
2. Fixate the gear and slide the width adjustment belt further over the gear so that the width
adjustment belt is one position further ahead or reverse.
3. Continue until the conveyor units are parallel to each other and the inspections boards move
through the conveyor units with ease.
4. When the width adjustment belt is in the right position the tension must be fastened again.
5. Go to section 3.15.3 Check system test to check the function.
3.15.3 Check system test
Requirement:
● Machine is switched on.