CP45FVNEO Maintenance Reference (Eng, Ver3).pdf - 第78页
Samsung Component Placer CP45NEO Series Maintenance Refer ence Edge Fixer Cylinder Stopper Cylinder Backup Ta b l e Cylinder Checking can be done conveniently by using t he ‘Manual I/O T est’ or ’Self Diagnostic’ on th…

Weekly Inspection
3-27
Warning
Do not insert any part of your body into the machine during
I/O testing. Otherwise, serious injury may result.
If any problems still occur, contact our designated C/S company (STS) and local
agent.
3.2.3. Operation of each Cylinder of the Machine
Inspection
Check the operation status of each cyclinder.
Check the operation detect sensor of each cyclinder.
Solution
Operate the teaching box to move the X Frame Ass’y to the rear side as far as
possible.
Warning
After clicking the “Motor Free” button on the teaching box,
click the “Stop” button on the front operation panel.
Conduct inspection while the motor power supply is turned
off.

Samsung Component Placer CP45NEO Series Maintenance Reference
Edge Fixer
Cylinder
Stopper
Cylinder
Backup
Table
Cylinder
Checking can be done conveniently by using the ‘Manual I/O Test’ or ’Self
Diagnostic’ on the MMI screen.
After selecting the Diagnosis from the main menu tool bar in the MMI screen, select
the I/O command from the sub menu tool bar to check the sensor operation.
ANC
Cylinder
In case the Cylinder does not operate, please contact our customer satisfaction
company (STS) or local agent.
Warning
Do not insert any part of your body into the machine during
I/O testing. Otherwise, serious injury may result.
3-28

Weekly Inspection
3-29
3.2.4. Conveyor Scetion
Check the state of contamination and operation over all of the conveyor.
3.2.4.1. Stopper End Inspection
Inspection
Check if there is any wear on the PCB connection face above the stopper.
Checking point o
f
the Stopper En
d
Figure 3-6. Stopper Inspection
Solution
Operate the teaching box to move the X Frame Ass’y to the rear side as far as
possible.