00194614-08 Trainingsdoku. SG X-Serie_X4i SW70x (AL2)_EN - 第330页

TwinHead Preparations for Placement (Module 2 Component ) T winHead Pickup and Place Cycle Student Guide SIPLACE X-Serie and X4I SW70x (AL2) 330 Placement (Module 1 Component) 9.3.6.1 Placement (Module 1 Component) Prepa…

100%1 / 522
TwinHead
TwinHead Pickup and Place Cycle Component centering module 1 and 2
329 Student Guide SIPLACE X-Serie and X4I SW70x (AL2)
Component centering module 1 and 2
9.3.5 Component centering module 1 and 2
Preparations for Placement (Module 1 Component)
9.3.6 Preparations for Placement (Module 1 Component)
X/Y axes position module 1 via the IC camera.
Z axis moves until the underside of the components
lies in the focus level.
IC-camera illumination is activated.
Move Z Axis again upwards.
Centering 1st component (near placement angle) is
finished
The X/Y axes position module 2 over the IC camera.
Z axis moves until the underside of the components
lies in the focus level.
IC-camera illumination is activated.
Move Z Axis again upwards.
The X/Y gantry axes move to the corrected
placement position.
The D-axis rotates by the placement angle correction
value.
TwinHead
Preparations for Placement (Module 2 Component) TwinHead Pickup and Place Cycle
Student Guide SIPLACE X-Serie and X4I SW70x (AL2) 330
Placement (Module 1 Component)
9.3.6.1 Placement (Module 1 Component)
Preparations for Placement (Module 2 Component)
9.3.7 Preparations for Placement (Module 2 Component)
The Z axis moves downwards in standard mode (2 N
contact force).
The Force increase up to the programmed level after
contact of the component on the PCB.
With this Force signal the End signal is set. The air
blast control is activated too.
At air blast level for placement ..
The next pickup sequence is prepared for module 2.
The X/Y gantry axes moves to the actual (corrected)
placement position.
The D-axis rotates by the placement angle correction
value.
TwinHead
Settings Description of Boards on the TwinHead
331 Student Guide SIPLACE X-Serie and X4I SW70x (AL2)
Placing the Component (Module 2 Component)
9.3.7.1 Placing the Component (Module 2 Component)
Settings
9.4 Settings
Descript ion of Boards on t he TwinHe ad
9.4.1 Description of Boards on the TwinHead
All adjustments described in this chapter are head specific and apply here for the TwinHead.
Head Adapter for TwinHead (for X Series with A364)
9.4.1.1 Head Adapter for TwinHead (for X Series with A364)
The head adapter board connects the head interface from the bottom side directly. The main boards of
TwinHead segments 1 and 2 are connected directly via 2 flat ribbon cables, each. This head adapter
must be changed for head modularity, if you use a C&P head.
Head adapter for TwinHead
The Z axis moves downwards in standard mode (2 N
contact force).
The Force increase up to the programmed level after
contact of the component on the PCB.
With this Force signal the End signal is set. The air
blast control is activated too.
At air blast level for placement Z Axis move upwards
with Standard profile.
The next pickup sequence is prepared for module 1.
* Troubleshooting: If the air blast pressure is not reached
during placement, a vacuum check will be performed in
the Z axis up position, to see whether the component has
been placed or not.