00197790-01PDFA - 第16页
Installation Guide Ausgabe 08/2014 Edition 16 route the cable fr om the outside of the m achine through the m achine base to location 2 open side cover at locat ion 2 5 4

Installation Guide Ausgabe 08/2014 Edition
15
route the cable underneath the transport module
2
3

Installation Guide Ausgabe 08/2014 Edition
16
route the cable from the outside of the machine through the machine base to location 2
open side cover at location 2
5
4

Installation Guide Ausgabe 08/2014 Edition
17
connect the blue wire 03102822-01 to Neutral at the clamping block X99 shown in the picture
route the wire 03102818-01 to the outside of the switching unit