00197288-02_AI_TBO_SX12_V2_DE_EN - 第42页
1 Introduction 1.5 Abbreviations 42 Assembly Instructions / Montageanleitung SIPLACE SX1/SX2 V2 Thick Board Option Option Dicke Leiterplatte 02/2019

1 Introduction
1.4 Staff qualifications and training
Assembly Instructions / Montageanleitung SIPLACE SX1/SX2 V2 Thick Board Option Option Dicke Leiterplatte
02/2019
41
1.4 Staff qualifications and training
Qualified or adequately trained personnel means that these people are familiar with the setting up,
operation and maintenance of the machine and the add-on devices and are suitably qualified, e.g.:
●
Have been trained, instructed or authorized to switch on and off, isolate, earth and identify
electrical circuits and system components in accordance with normal safety standards.
●
Have been trained or instructed in the upkeep and use of appropriate safety equipment in
accordance with normal safety standards.
●
Have received first aid training.
1.5 Abbreviations
Abbreviation Description
COT Changeover table
DC Dual conveyor with 2 lanes
ESD Electrostatic sensitive device
EMC Electromagnetic compatibility
PA Placement area
PCB
Printed circuit board
SC
Single conveyor with 1 lane

1 Introduction
1.5 Abbreviations
42 Assembly Instructions / Montageanleitung SIPLACE SX1/SX2 V2 Thick Board Option Option Dicke Leiterplatte
02/2019

2 Brief Description
2.1 Product Description
Assembly Instructions / Montageanleitung SIPLACE SX1/SX2 V2 Thick Board Option Option Dicke Leiterplatte
02/2019
43
2 Brief Description
The "Thick Board" option enables you to place boards with a thickness up to 6.5mm.
2.1 Product Description
The "Thick Board" option is needed in order to process boards with a thickness up to 6.5mm.
You also need to use other clamping rails and will have to lower the entire conveyor.
2.2 Prerequisites
This option can be fitted in all SX1/SX2 V2 machines from serial number Lxxxx.
NOTICE
Other machine types
► For machines of type SX1/SX2/DX1/DX2 (serial number Kxxxx), read the Assembly
Instructions "Thick Board 6mm – SX1/SX2 – DE+EN" [00196613‑xx].
2.3 Restrictions
●
Once you have installed this option, you will no longer be able to clamp boards with a thick-
ness of below 2 mm.
●
Both conveyor lanes need to be converted when using a dual conveyor. If you do not convert
both sides, the Z axis for the placement heads will not reach far enough down and the PCB fi-
ducials will be outside the focus of the PCB camera.
2.4 Scope of Delivery
"Thick Board option SX1/SX2 V2" [00519871-xx] package (for one conveyor lane)
NOTICE
Dual Conveyor
The package contains all parts needed to convert one conveyor lane. You will need to order
this package 2x for a dual conveyor.
Quantity Designation Item no.
2 Clamping rail for thick board SX1a assembly 03099567-xx
4 ISO 14581 M5x25-8.8, chem. nickel-plated 03095127-xx
4 ISO 14581 M5x14.7-8.8, chem. nickel-plated 03098065-xx
1 Warning sign no. W208 03009347-xx
1 Assembly instructions “Thick Board Option" (DE+EN) (this docu-
ment)
00197288-xx
2 Washer for clamping plate 03091791-xx
2 Clamping plate washer 03091711-xx
2 DIN 7991 - M4x8-A2-70 03047055- xx
4 Setting screw 3mm SXa 03104139-xx
4 U-distance 2mm 03104937-xx
4 U-distance 5mm 03104924-xx