00198328-01_AI_Basic Pack Vakuum Tooling_TX_DE_EN.pdf - 第52页

2 Brief Description 2.4 Tools and Equipment Required 52 Montageanleitung / Assembly Instructions SIPLACE TX-Serie Basic Pack Vacuum Tooling 07/2017 2.4 Tools and Equipment Required The following tools and equipment are r…

100%1 / 70
2 Brief Description
2.3 Scope of Delivery
Montageanleitung / Assembly Instructions SIPLACE TX-Serie Basic Pack Vacuum Tooling 07/2017 51
Vacuum switch + plate
PUN 10 – 70 mm
PUN 10 – 2800 mm
PUN 8 – 2800 mm
PUN 6 – 300 mm
PUN 6 – 800 mm
2 Brief Description
2.4 Tools and Equipment Required
52 Montageanleitung / Assembly Instructions SIPLACE TX-Serie Basic Pack Vacuum Tooling 07/2017
2.4 Tools and Equipment Required
The following tools and equipment are required for the work described in this manual:
Standard tools
2.5 Required Working Time
The complete installation including settings will take approx. 5 hours.
The machine standstill time is approx. 2 hours.
Programming work on the SIPLACE Pro computer may also be needed.
3 Installation
3.1 Preparatory Steps
Montageanleitung / Assembly Instructions SIPLACE TX-Serie Basic Pack Vacuum Tooling 07/2017 53
3 Installation
3.1 Preparatory Steps
Move the component trolley at location 2 out of the machine.
Switch off the machine, disconnect it from the air supply and the power supply.
Remove the left slide plate (1), the corner cover
(2) and the waste tape chute (3).
Remove the cover plate (1) at the machine base
of location 2.
If a T-piece is installed in the control block, re-
place it with a crosspiece.
Fit the FESTO connection on the top output.
Run the PUN10 pneumatic hose via the opening
inside the machine through the side panel to the
crosspiece.
Connect the PUN10 pneumatic hose to the
crosspiece.