DECAN_S1_Maintenance_EN.pdf - 第26页
chapt er 2 Inspe ction It ems fo r Main t e nanc e Nex t Generation, Multi- Funct ional Placer DE CAN S 1 Mai nte nan ce H an dbo ok 2-5 Monthly Inspections (1/2) Che ck-up List Rep la cement Time Referen ce Time requ ir…

chapter 2
Inspection Items for Maintenance
Next Generation, Multi-Functional Placer
DECAN S1 Maintenance Handbook
2-4
Weekly Inspections
Inspection Items for Maintenance

chapter 2
Inspection Items for Maintenance
Next Generation, Multi-Functional Placer
DECAN S1 Maintenance Handbook
2-5
Monthly Inspections (1/2)
Check-up List
Replacement
Time
Reference
Time
required
Period No Inspection Item Measures Tools
Monthly
M-1 Head Spindle Clean Air gun, cloth 30 Minutes
M-2 Conveyor Sensor / Fiducial Mark Inspect and clean Cotton swab, cloth 10 Minutes
M-3 Right Cover Cooling Fan Inspect and Replace
Flathead Screw driver, vacuum
cleaner
10 Minutes
M-4 Front, Rear Cover Cooling Fan Inspect and Replace Vacuum cleaner 6months 15 Minutes
Setting the replacement period for parts
ㆍ Based on the regulated use environment.
ㆍ If the use environment is poor, the intervals for part inspection and replacement can be shortened.
ㆍ In the above table, C/S means our designated C/S company (STS) or our overseas local agents.
Monthly Inspections (1/2)

chapter 2
Inspection Items for Maintenance
Next Generation, Multi-Functional Placer
DECAN S1 Maintenance Handbook
2-6
Monthly Inspections (1/2)
Inspection Items for Maintenance