DECAN_S1_Maintenance_EN.pdf - 第27页

chapt er 2 Inspe ction It ems fo r Main t e nanc e Nex t Generation, Multi- Funct ional Placer DE CAN S 1 Mai nte nan ce H an dbo ok 2- 6 Monthly Inspections (1/2) Inspection It ems for Maint enanc e

100%1 / 80
chapter 2
Inspection Items for Maintenance
Next Generation, Multi-Functional Placer
DECAN S1 Maintenance Handbook
2-5
Monthly Inspections (1/2)
Check-up List
Replacement
Time
Reference
Time
required
Period No Inspection Item Measures Tools
Monthly
M-1 Head Spindle Clean Air gun, cloth 30 Minutes
M-2 Conveyor Sensor / Fiducial Mark Inspect and clean Cotton swab, cloth 10 Minutes
M-3 Right Cover Cooling Fan Inspect and Replace
Flathead Screw driver, vacuum
cleaner
10 Minutes
M-4 Front, Rear Cover Cooling Fan Inspect and Replace Vacuum cleaner 6months 15 Minutes
Setting the replacement period for parts
Based on the regulated use environment.
If the use environment is poor, the intervals for part inspection and replacement can be shortened.
In the above table, C/S means our designated C/S company (STS) or our overseas local agents.
Monthly Inspections (1/2)
chapter 2
Inspection Items for Maintenance
Next Generation, Multi-Functional Placer
DECAN S1 Maintenance Handbook
2-6
Monthly Inspections (1/2)
Inspection Items for Maintenance
chapter 2
Inspection Items for Maintenance
Next Generation, Multi-Functional Placer
DECAN S1 Maintenance Handbook
2-7
Monthly Inspections (2/2)
Check-up List
Replacement Time Grease
Time
required
Period No Inspection Item Measures Tools
Monthly
M-5 Y Axis Linear Motor, Magnet Inspect and clean cloth 15 Min
M-6 Control Rack Cooling Fan Inspect and clean
Flathead Screw driver, Vacuum
cleaner
10 Min
M-7 Head Spindle, Mirror CAM
Cleaning and
apply grease
Brush, cloth, Syringe
Inspection period:
3months
GREASE-GADUS_S2 V220 2 30 Min
M-8 Beam Splitter Inspect and clean Air spray, (+) driver 20 Min
M-9
X Frame LM Guide, Ball
Screw
Cleaning, apply
grease,inject
grease
Lubricator, cloth, wrench(M3, M4)
Industrial use paper wipe, Steel
plate with thickness of 2.0mm
Lubrication period: 4
months
GREASE-GREASE_AFE-CA 60 Min
M-10 Y Frame LM Guide
Clean and inject
grease
Lubricator, cloth
Lubrication period: 2
months
GREASE-GREASE_AFE-CA 60 Min
M-11
Conveyor LM Guide, Lead
Screw
Cleaning, apply
grease,inject
grease
Lubricator, Brush, cloth
Lubrication period: 6
months
Grease period: 2months
GREASE GADUS S2 V220-2 30 Min
M-12 Cover Cleaning
Ultra-fine fiber cloth, Alcohol,
Heavy Duty Staticide #2005, #2001
Inspection period: 1
months
30 Min
Setting the replacement period for parts
Based on the regulated use environment.
If the use environment is poor, the intervals for part inspection and replacement can be shortened.
In the above table, C/S means our designated C/S company (STS) or our overseas local agents.
Monthly Inspections (2/2)