00198353-01_AI_Location 1 Upgrade Kit_E by SIPLACE_en - 第22页
2 Installing the Location 1 Upgrade Kit [03113225‑xx] (FixedtoMov- 2.5 Final Work Assembly Instructions E by SIPLACE Location 1 Upgrade Kit 04/2017 22 2.5 Final Work ► Tighten the cable ties securing the two tubes behi…

Assembly Instructions E by SIPLACE
Location 1 Upgrade Kit 04/2017
2 Installing the Location 1 Upgrade Kit [03113225‑xx] (FixedtoMov-
2.4 Connection to solenoid valve
21
2.4 Connection to solenoid valve
► Connect the marked tube [03111719-xx] to the bottom right port of the solenoid valve.
► Connect the unmarked tube [03111719-xx] to the bottom left port of the solenoid valve.
► Use the tube [03111720-xx] to connect the top right port of the solenoid valve to the rear port
of the cylinder.
► Use the short tube [03111718-xx] to connect the top left port to the Tee Joint.
► Use the tube [03111722-xx] to connect the Tee Joint to the front port of the cylinder.
► Connect the 4mm tube from the push-out cylinder of [03104512-xx] to the 4mm output of the
Tee Joint.

2 Installing the Location 1 Upgrade Kit [03113225‑xx] (FixedtoMov-
2.5 Final Work
Assembly Instructions E by SIPLACE
Location 1 Upgrade Kit 04/2017
22
2.5 Final Work
► Tighten the cable ties securing the two tubes behind the tape cutter.
► Install the covers.

Assembly Instructions E by SIPLACE
Location 1 Upgrade Kit 04/2017
2 Installing the Location 1 Upgrade Kit [03113225‑xx] (FixedtoMov-
2.5 Final Work
23
► Install the Empty Tape Duct
at location 1.
► Install the Location 1
Movable Table Covers
[03112980-xx]
► Install the waste tape chute.