YSM10安装调整(eng) - 第13页

For Ser v ice E n gineer Service Information SI1610004E -000= YSM10_Proced ures for the adjustmen ts required after installing a machine 13/107 3.5 1. Figure 8 2. Figure 9 3. 3.6       该文档 是 极速PDF 编辑器生成 , 如果想去掉该提示,…

100%1 / 107
For Service Engineer
Service Information
SI1610004E-000= YSM10_Procedures for the adjustments required after installing a machine
12/107
3.4 Connect to the power source and air supply
Caution:
Connections of the power and air supply
Figure 7
Specifications of the power and air supplies
Item
Specifications
󳪌󳪌󳪌
0.45MPa (4.5Kgf/cm
2
)
Set pressure:
0.40 ~ 0.41MPa
@@@@@@@@@@@󵖑󵖑󵖑
& 󷾒󵪈
Three-phase AC 200/208/220/240/380/400/416V
+/-10% 50/60Hz
Power capacity
󴕴󳹈
1.0kW
󳚜󵰶󵰶󶘇
Conductor cross-section area: 4 mm
2
or more
Table 10
to 0.40 ~ 0.41Mpa󷜛󷛈
.
该文档极速PDF编辑器生成
如果想去掉该提示,请访问并下载
http://www.jisupdfeditor.com/
For Service Engineer
Service Information
SI1610004E-000= YSM10_Procedures for the adjustments required after installing a machine
13/107
3.5
1.
Figure 8
2.
Figure 9
3.
3.6
该文档极速PDF编辑器生成
如果想去掉该提示,请访问并下载
http://www.jisupdfeditor.com/
For Service Engineer
Service Information
SI1610004E-000= YSM10_Procedures for the adjustments required after installing a machine
14/107
4.
4.1
Figure 10
Y-󷙵󷙵󷙵
See SI1004008E=
( , &
, .)
󷣐󷣐󷣐
󷌄󷌄󷌄
󷐵󷐵󷐵 󷌄󷌄󷌄 (ACP-Chip)
󷟩󷟩󷟩 󷌄󷌄󷌄
( )
󳫱󳫱󳫱
. 󷌄󷌄󷌄
该文档极速PDF编辑器生成
如果想去掉该提示,请访问并下载
http://www.jisupdfeditor.com/