YSi-V_Ope_E - 第64页

8. One-year inspection 4-22 8.1 W axis 4-22 8.1.1 Cleaning and greasing the W axis ball screws 4-22 8.1.2 Cleaning and greasing the W axes guides 4-23 8.1.3 Cleaning and greasing the hexagon spline 4-24 8.2 Inspecting an…

100%1 / 110
Chapter 4 Maintenance
Contents
Before beginning work 4-1
1. Maintaining YSi-V performance 4-2
1.1 Essential conditions and working environment 4-2
1.2 Importance of periodic inspections and cleaning 4-3
1.3 Importance of appropriate humidity management 4-3
2. Maintenance list 4-4
3. Preparing for maintenance tasks 4-6
3.1 Consumable parts 4-6
3.2 Maintenance tools 4-7
3.2.1 Cleaning tools 4-7
3.2.2 Lubricating tools and grease 4-8
3.3 Required tools 4-9
4. Weekly inspection 4-10
4.1 Checking the board sensor condition 4-10
4.2 Checking the board clamp condition 4-10
5. Monthly 4-11
5.1 Inspecting each axis 4-11
5.2 Cleaning and greasing the ball screws and linear guides 4-12
5.2.1 Cleaning and greasing the X axis ball screws 4-12
5.2.2 Cleaning and lubricating the X axis guides 4-13
5.2.3 Cleaning and greasing the Y axis ball screws 4-14
5.2.4 Cleaning and greasing the Y axes guides 4-16
5.3 Cleaning the camera lighting unit 4-17
6. Three-month inspection 4-18
6.1 Air intake fan filter 4-18
6.2 Cleaning and greasing the CZ axis (option) ball screws 4-19
7. Six-month inspection 4-20
7.1 Cleaning and greasing the marking unit (option) cam 4-20
7.2 Cleaning controller filter (For Type HS2 only) 4-21
8. One-year inspection 4-22
8.1 W axis 4-22
8.1.1 Cleaning and greasing the W axis ball screws 4-22
8.1.2 Cleaning and greasing the W axes guides 4-23
8.1.3 Cleaning and greasing the hexagon spline 4-24
8.2 Inspecting and cleaning the air/mist filters 4-25
9. How to replace consumable parts 4-27
9.1 Cleaning and replacing the conveyor belts 4-27
9.2 Replacing the UPS (uninterruptible power supply) battery 4-29
4-1
4
Maintenance
Before beginning work
In most cases, maintenance should be performed with the main power turned off.
However, some maintenance tasks are performed under emergency stop conditions with the power turned on.
In such cases, ensure adequate safety and press the emergency stop before beginning the maintenance.
The power is turned on during maintenance where any servo-axis must be operated or YSi-V operation
checked. In this case, also ensure adequate safety before beginning the maintenance.
When operating the YSi-V, make sure the following conditions are met.
n
Operating conditions
1. Supply air pressure is kept at correct pressure.
2. All safety covers are closed.
3. Power cable is correctly connected.