3 Fitting the Gantry
3.4 Installing the Gantry
Assembly Instructions / Montageanleitung SIPLACE SX1/SX2 V3 Gantry Modularity Portalmodularität 05/2020 101
Fig.28: Docking in at the gantry carrier
1. Docking hook on the gantry carrier
2. Docking unit on the machine linear
guides
Move the gantry forwards so that the
gantry carrier docking hooks (1) are in
front of the machine docking unit (2).
Always check the right and left sides.
Hooking the gantry carrier into place on the machine
Fig.29: Lifting the gantry
Lift the gantry so that the gantry carrier
docking hooks (1) are above the
machine docking unit (2).
Carefully lower the gantry so that the
two docking hooks (1) slide reliably into
the openings in the docking unit (2).
Always check the right and left sides.
Fig.30: Docking hook hooked into place
The docking hooks are hooked into place on
the left (1) and right (2) sides.
The gantry carrier with the gantry is now
fixed reliably onto the machine.
3 Fitting the Gantry
3.4 Installing the Gantry
102 Assembly Instructions / Montageanleitung SIPLACE SX1/SX2 V3 Gantry Modularity Portalmodularität 05/2020
Remove the tilt guard and move in the gantry
Fig.31: Opening the tilt guard
Open the tilt guard (1).
Push the gantry (2) into the machine so
that both sides of the gantry rest on the
two linear guides.
Move the gantry lift with the gantry car-
rier out of the location.
Fig.32: Pulling the trailing cable
Move the gantry (2) into the machine
so that the trailing cable (1) can be
pulled underneath, through the gantry.
Fig.33: Flat ribbon cable and pneumatic connections
Carefully place the flat ribbon cable (1)
and the pneumatic connections (2) over
the gantry.
Remove the black plastic foil. A cable
tie fixes the black plastic foil to the trail-
ing cable(3).
3 Fitting the Gantry
3.5 Connecting the Trailing Cable
Assembly Instructions / Montageanleitung SIPLACE SX1/SX2 V3 Gantry Modularity Portalmodularität 05/2020 103
3.4.1 Fitting the Short End Position Buffer
The short end position buffer must be fitted in SIPLACE SX machines with two gantries.
This buffer needs to be removed and replaced with the long end position buffer in SIPLACE SX
machines with one gantry at location 1.
Fit the end position buffer (2) to the left
side.
Fit the end position buffer (3) to the
right side. The safety switch (4) for the
buffer monitoring function must engage
in the Schmersal switch.
Tighten the fastening screws (1) for the
buffers with a torque of 14Nm.
3.5 Connecting the Trailing Cable
Fig.34: Cover
Remove the cover (1) over the gantry
interface. To do this, remove the two
fastening screws on the right side and
carefully open the bottom left pushbut-
ton.
Fig.35: Fitting the trailing cable
Fit the trailing cable holder (1) from
below, to the gantry distributor holder.
See the following section.
Carefully place the flat ribbon cable and
the pneumatic hoses to one side (2).
Make sure you do not damage the
cables and hoses.
Take care that the alignment is correct
and that all cables and hoses are run
above one another and evenly.
 NOTICE!
Use the correct gantry with Gig E trail-
ing cable, since only this can be con-
nected as described. It is not possible
to connect an older gantry with hotlink
trailing cable.
.