00198705-01_AI_Portalmodularität_SX12_V3_DE_EN - 第123页

5 Annex 5.1 Overview of MGCU (Rxxxx) Assembly Instructions / Montageanleitung SIPLACE SX1/SX2 V3 Gantry Modularity Portalmodularität 05/2020 123 5 Annex 5.1 Overview of MGCU (Rxxxx) Fig.67: Overview of MGCU

100%1 / 126
4 Dismantling a Gantry
4.3 Checklist
122 Assembly Instructions / Montageanleitung SIPLACE SX1/SX2 V3 Gantry Modularity Portalmodularität 05/2020
4.3 Checklist
Put this check list in the machine logbook.
Gantry dismantled (downgrade)
Step Action Who?
1 Gantry removed? Customer in line with assembly
guide
2 Is the gantry secured in the gantry carrier? Customer in line with assembly
guide
3 Head secured in center of gantry? Customer in line with assembly
guide
4 Are the correct end position buffers fitted? Customer in line with assembly
guide
5 Has the trailing cable been packed correctly and
fixed in the machine?
Customer in line with assembly
guide
6 Has the stationary camera (optional) been dis-
mantled, if necessary?
Customer in line with assembly
guide
7 Have the camera connections been unplugged from
the box PC?
Customer in line with assembly
guide
8 Has the nozzle changer been dismantled, if neces-
sary
Customer in line with assembly
guide
9 Is the reject bin fitted? Customer in line with assembly
guide
10 Have all tools been removed from the machine? Customer in line with assembly
guide
11 Are the doors screwed? Customer in line with assembly
guide
12 Is the machine switched on and ready for operation? Customer in line with assembly
guide
13 Have all calibration steps been performed? Customer in line with assembly
guide
Date Signature
5 Annex
5.1 Overview of MGCU (Rxxxx)
Assembly Instructions / Montageanleitung SIPLACE SX1/SX2 V3 Gantry Modularity Portalmodularität 05/2020 123
5 Annex
5.1 Overview of MGCU (Rxxxx)
Fig.67: Overview of MGCU
5 Annex
5.1 Overview of MGCU (Rxxxx)
124 Assembly Instructions / Montageanleitung SIPLACE SX1/SX2 V3 Gantry Modularity Portalmodularität 05/2020