00198705-01_AI_Portalmodularität_SX12_V3_DE_EN - 第81页
2 Brief Description 2.1 Overview Assembly Instructions / Montageanleitung SIPLACE SX1/SX2 V3 Gantry Modularity Portalmodularität 05/2020 81 Fig.6: Upgrade of SX1 and SX1 prepared These arrows show the gantry upgrade pro…

2 Brief Description
2.1 Overview
80 Assembly Instructions / Montageanleitung SIPLACE SX1/SX2 V3 Gantry Modularity Portalmodularität 05/2020
2.1.3 Overview of "Fast Gantry Modularity"
The following flow diagrams show the key steps to be performed. The exact steps required depend
on the individual machine type.
A differentiation needs to be made between the first and any later upgrades (2. to n.), in relation to
the Fast Gantry Modularity function, as additional work is required for the first upgrade (e.g. in-
stalling the nozzle changer, reject bin and sensors). This additional work does not need to be re-
peated for later upgrades, as these parts can remain in the machine during the gantry download.
The lowest time needed for work, approx. 30min, is incurred during upgrade of an SX1 prepared
machine to an SX2, which is equipped with a C&P20 or CPP head for the second gantry. This is
shown by the broken lines in the flow diagrams.
Fig.5: Upgrade of SX+ and SX+ prepared

2 Brief Description
2.1 Overview
Assembly Instructions / Montageanleitung SIPLACE SX1/SX2 V3 Gantry Modularity Portalmodularität 05/2020 81
Fig.6: Upgrade of SX1 and SX1 prepared
These arrows show the gantry upgrade procedure involving the least work for the relev-
ant machine types.
Work to be performed:
1 Prepared kit 180 min SIPLACE Service
2 Rerail gantry 15 min Customer
3 NC row 1 30 min Customer
NC row 2 20 min Customer
4 Outer table position 60 min SIPLACE Service, customer
5 Reject bin sensors (op-
tional)
15 min Customer
6 Stationary cameras 30 min SIPLACE Service, customer
7 Calibrating the machine 15 min Customer
8 PCB/component map-
ping
30 min per conveyor lane CPx
70 min per conveyor lane TH
SIPLACE Service, customer
CAUTION
PCB/component mapping
If a SX1 prepared or a prepared kit is installed at the customer site and a second gantry is
mounted for the first time, a complete PCB/component mapping for the 2nd gantry is required.
This is necessary because of the extended Y-traversing path and the Y-drive motor lying on
the other side of the machine.
Component mapping is always required for a gantry upgrade with Twin Head (VHF TH).
Recommendation: if gantries are replaced, component mapping should be performed for
process reliability (accuracy) reasons.
(See 4.2 "Performing Calibration" [}119])

2 Brief Description
2.1 Overview
82 Assembly Instructions / Montageanleitung SIPLACE SX1/SX2 V3 Gantry Modularity Portalmodularität 05/2020
2.1.4 Configurations
2.1.4.1 Table Positions
The table position required for the SIPLACE SX1/SX2 varies according to the head configuration:
SIPLACE SX1:
Gantry 1 C&P20P2 CPP_L CPP_H
without stat.
camera
CPP_H with
stat. camera
TH
Table position
location 1
Inner Inner Inner Outer Outer
Table position
location 2
Inner Inner Inner Inner Inner
SIPLACE SX2:
Gantry 1 C&P20
P2
CPP_L CPP_L C&P20
P2
CPP_H
with stat.
camera
CPP_H
with stat.
camera
TH TH
Table
position
location 1
Inner Inner Inner Inner Outer Outer Outer Outer
Gantry 2 C&P20
P2
CPP_L C&P20
P2
CPP_L CPP_H
with stat.
camera
CPP_H
without stat.
camera
CPP_H
with
stat.
camera
CPP_H
without
stat.
camera
Table
position
location 2
Inner Inner Inner Inner Outer Inner Outer Inner
NOTICE
CPP: only with stationary camera IC camera SST33
TH: with stationary camera IC camera SST33 at both locations, FC camera SST25 at loca-
tion 1 only