'操作说明 Hotflow THREE_26_zh.pdf - 第490页
T ranslation of the original ENGLISH 7. COMMISSIONING 451820.66.03_EN 2020-05-05 33 7. COMMISSIONING Follow the safety notes in chapter 1! At storage temperatures < +10 °C, ensure acclimatization takes place before sw…

6. ASSEMBL Y ENGLISH Translation of the original
32
451820.66.03_EN
2020-05-05

Translation of the original ENGLISH 7. COMMISSIONING
451820.66.03_EN
2020-05-05
33
7. COMMISSIONING
Follow the safety notes in chapter 1!
At storage temperatures < +10 °C, ensure acclimatization takes place before switching on
(condensate formation). Only use the cooling unit for cooling water. Only use water to fill the
water circuits, following the relevant specifications!
As a rule, the water circuit must be set up before the refrigerant circuit!
7.1 Water circuit
7.1.1 Requirements for the water
See chapter 1.10
7.1.2 Commissioning of atmospherically open single- and dual-circuit systems
Tasks to be carried out:
If the direction of rotation of the pump is incorrect, disconnect the cooling unit from the
power and swap 2 phases of the main connection cable.
1. Switch mains disconnecting device (main switch) to position "0"
2. Ensure all motor protection switches, control switches and circuit breakers are in
position -0-
3. Remove covering panels on the service side
4. Remove the tank lid
5. Fill tank with water up to the -MAX- marking on the fill level indicator
6. Purge the pump(s) via the bleeder screw on the pump housing
7. Switch fuses and motor protection switches for pump(s) and fan(s) to position "1"
(see wiring diagram)
8. Switch on the pump(s) via the mains disconnecting device, control switch in position -1-
9. Check the specified direction of rotation of the pump(s) (see rotation direction arrow on
the drive motor)
10. Perform a visual check of the entire water circuit for leaks
11. Check the fill level indicator to ensure compliance with the requisite water fill level;
refill with water if necessary
12. Mount the tank lid and covering panels

7. COMMISSIONING ENGLISH Translation of the original
34
451820.66.03_EN
2020-05-05
7.1.3 Commissioning of pass-through system
Tasks to be carried out:
If the direction of rotation of the pump is incorrect, disconnect the cooling unit from the
power and swap 2 phases of the main connection cable.
In the case of closed water circuits, activate the on-site additional purging facility.
1. Switch mains disconnecting device to position "0"
2. Ensure all motor protection switches, control switches and circuit breakers are in
position -0-
3. Remove covering panels on the service side
4. Purge the pump(s) via the bleeder screw on the pump housing
5. Switch fuses and motor protection switches for pump(s) and fan(s) to position "1"
(see wiring diagram)
6. Switch on the pump(s) via the mains disconnecting device, control switch in position -1-
7. Check the specified direction of rotation of the pump(s) (see rotation direction arrow on
the drive motor)
8. Perform a visual check of the entire water circuit for leaks
9. Mount covering panels