Introduction(CP45FV) Eng.pdf - 第101页
T ransfer & Installation Pr ocedur e 7-1 1 Caution If the power supply and machine i n terior are not checked before turning the main switch on, the machine may become damaged or the user may get injured. The user mu…

Samsung Component Placer CP45FV Series Introduction
Table 7-1. Signals and Interface
Signal Item Specifications Remark
PIN No.1: (+)Input Signal Less than
24 V/10mA
Busy Input(In)
PIN No.2: (-) Ground
PIN No.3: Contact output Board
Available
Output(Out)
PIN No.4: Contact output
AMP 206043-1 Machine Side
From
Next
M/C
Connector
AMP 206044-1 External Connection
PIN No.1: Contact output
Busy
Output(Out)
PIN No.2: Contact output
PIN No.3: (+) Input Signal Less than
24 V/10mA
Board
Available
Input(In)
PIN No.4: (-) Ground
AMP 206043-1 Machine Side
In-Line
Signal
From
Previous
M/C
Connector
AMP 206044-1 External Connection
When the I/F connector between adjacent machines is different from each other, cut
the cables and connect them referring to the following figure.
Unit#1 Unit#2 Unit#3
▶▶
PREVIOUS (IN)
NEXT (OUT)
20~22V
①②
20~22V
①②
20~22V
①②
0~
∞
Ω
③④
PREVIOUS (IN)
NEXT (OUT)
PREVIOUS (IN)
NEXT (OUT)
0~
∞
Ω
③④
0~
∞
Ω
③④
Machines manufactured not in accordance with the SMEMA code such as
SIMENS, SANYO and TDK (RX-11), and machines without dual contact
interface shall be examined specially.
Setup in accordance with dual contact method and SMEMA method when
determining the interface type
CP40: Execute SCPINI.EXE and Select ‘SMEMA’ checkbox from
OPTION(menu) with mouse.
CP45: Execute MARK3.exe and Click Pref (submenu) from
SYS.SETUP(menu) and select one of the options including Stand Alone,
SSA Type(dual contact) and SMEMA from IN(After) and OUT(After)
combo boxes.
27. Before turning on the main circuit breaker, check again to determine if there is any
obstacle inside the machine or on the conveyor.
28. If the area surrounding the machine is clear, turn on the main switch of the machine.
7-10

Transfer & Installation Procedure
7-11
Caution
If the power supply and machine interior are not checked
before turning the main switch on, the machine may
become damaged or the user may get injured. The user
must check the inside and around the machine before
turning on the main switch.
29. If the program is loaded, turn on the <Main Start> switch above the main switch.
Reference
When the program is being loaded, if the <Emergency> switches at the front and rear
sides of the machine are released, “I/O DPRAM Initialization Error” may occur. In this
case, be sure to check whether the <Emergency> switches have been released or not.
30. If all programs have been loaded, turn on the <Ready> switch located in the front
switch panel.
31. Push the X frame and traveling unit slightly to the center of the X axis, so that the
home sensor of each axis cannot be detected. Then, proceed to home them using the
jog box. Before homing, secure the safety of the machine through the following
procedure.
32. Using the teaching box, enlarge the width as wide as necessary.
33. Click ‘Diagnosis’ on the main menu tool bar, then click the <I/O> (F2) on the
auxiliary menu tool bar at the bottom.
Figure 7-10. “I/O Status” dialog box
34. Select the <Conveyor_IN> or <Conveyor_OUT> from the <Output Status> list box.
Then, check if the other outputs are also generated correctly.
35. Once the conveyor begins running, feed the test board through the inlet of the
conveyor.

Samsung Component Placer CP45FV Series Introduction
36. From the <Input Status> list box, check if the test board detecting sensors at each
point are operating correctly and whether other inputs are operating under normal
conditions.
37. Check the factory constant, factory debug and system constant value of the system
setup.
38. If all are in normal condition, begin operating the machine in accordance with the
manufacturing procedure.
Caution
To relocate the machine, first shut down PC on the
machine and turn off the main switch. Then pack it
following the reverse order of installation procedure(No.1~
No.27). When the machine is moved completely, Repeat
the installation procedure(No.1~No.38)
7.1. Warm-Up
Warming Up operation is performed prior to the placement step in order to enhance the
placement precision. Warming Up helps to maintain the system, parts and lubrication oil
at a normal temperature and during winter time prevents the reduction of placement
precision due to contraction of balls, screws, and other components. Approximately 10
minutes of Warming Up is preferable. Warming Up operation is not necessary if less than
2 hours has elapsed from the previous placement work.
Caution
To raise the level of placement precision, Warming UP
must be done.
To raise the level of placement precision, be sure to carry
out warm up before operating the machine.
Operational procedure
1. Select and press <Utility> from the MMI main menu tool-bar. Then select <Warm-
Up> command from the sub menu tool-bar on the left shown.
7-12