T ransfer & Installation Pr ocedur e 7-5 Level Figur e 7-4. Machine level adjustment – us ing the spanner supplied with the machine 15. Adjust the level placing the level on the t op surface of the feeder base and Y1…

Samsung Component Placer CP45FV Series Introduction
Figure 7-2. How to remove Clamp X
Caution
If the power switch is turned on without removing the X and
Y clamps, the machine may become damaged. Remove the
X and Y clamps before supplying power.
12. Remove the Y clamps fixing the ball screws of the Y axis (including the urethane
cushion).
Figure 7-3. How to remove Clamp Y
13. If necessary, remove the cable ties bound on the Z axis, and move the head manually
to the center. Also, keep the clamps in the plastic bag after fixing it with screws.
Caution
It may cause damage to the machine if the machine is
operated without removing the cable ties bound on the Z
axis. Be sure to turn the power on after removing the cable
ties bound on the Z axis.
14. The reference level of the machine is EL+900mm and 950mm (based on Europe
standard, CE) from the surface of the PCB, that is, the surface of the conveyor.
However, depending on the floor condition (slope), ±15mm is allowable.
7-4

Transfer & Installation Procedure
7-5
Level
Figure 7-4. Machine level adjustment – using the spanner supplied with the machine
15. Adjust the level placing the level on the top surface of the feeder base and Y1 axis
L/M guide. The accuracy of the level gauge shall be 0.02mm/m, and its tolerance
shall be less than 0.05mm/m.
16. The foot of the machine must be supported on the floor with even supporting force.
To achieve this, the locking pressure of the nuts of the leg shall be adjusted so that
equal force may be applied to the legs. Check if there is any nut loosely tightened.
After level adjustment is completed, tighten the nuts securely.
Caution
Unless the machine is level, the accuracy of the machine
will be affected. Ensure that the machine is level and check
if the legs of the machine are tightened securely.
The procedure for adjusting the level of the machine is given below.
After moving the new machine near to the existing one, lower the legs of the machine
so that it is aligned level with the existing machine. Then adjust the level keeping the
level difference below 0.1mm/m.
Using a lever, move the machine to the position where the gap between the existing
machine and the edge of the conveyor can be kept between 3~5mm.
Put the PCBs on each conveyor of the two machines, and set the machines so that the
level difference is 0.05~0.1mm, enough to allow the PCBs to move downward.
Essentially, the slope of the conveyor shall be set to allow for the “Downflow” of the
PCB in the direction in which the PCB is moving. To ensure the straight movement of
the PCB between machines, the machines must be installed correctly so that there
will be no unparallel gap at either front or rear side of the PCB, when the PCB is
tightly contacted to the reference line.

Samsung Component Placer CP45FV Series Introduction
PCB #2
PCB #1
Adjust the machine level until there is no blocking sound at the gap between
machines while pushing the PCB slowly.
PCB #1 PCB #2
In the case of level adjustment between two machines, it is difficult to set the level of
the second machine so that its tolerance can be maintained to be less than 0.05 mm/m
because its conveyor cannot be leveled. Therefore, adjust the level of the machine so
that the level tolerance can be maintained to be less than 0.05 mm/m in the left and
right side direction of the PCB (PCB flow direction), and less than 0.1 mm/m in the
front and rear side direction of the PCB.
When adjusting the level of the machine legs, it is recommended to adjust the level in
one direction at a time by combining two legs into one set as per the following
Figure)
Level in the front and rear direction: Adjust the level of the front and rear legs in
pairs.
Level in the left and right direction: Adjust the level of the left and right legs in
pairs.
Adjust the legs in pairs
Direction of the level
Front and rear side
adjustment
Right and left side
adjustment
Figure 7-5. Adjusting the level between two machines
17. Install supports for the monitors and mount them on the top of the machine.
Assemble the connector inside of the machine and install two monitors (when
assembling, tighten the bolts completely)
18. Install the signal light with 4 bolts to the left of the top surface, and connect the lamp
7-6