Install Tray Unit (Re-setup after t ray unit moved) SEET 18/19 WKGB-10105-02 Installing Tray Unit (Re-setup after tray uni t mov ed )  [Adjustment of p ath l ine sensor] 1 Remove front cover of tray unit. 2 Store the t…

100%1 / 712
Install Tray Unit (Re-setup after tray unit moved)
SEET
17/19
WKGB-10105-02
Installing Tray Unit
(Re-setup after tray unit moved)
20.
Select “0105” from the dropdown list.
21.
Press the SET #1 button to open the VU Axis
screen.
22.
Relative-move by 12[mm] from the supply No. 505.
20.
Perform setup from Z506 to Z515 by the same
procedure.
Reference (Moving amount on each stage):
Z501(1 ST SET) Z505(2 ND SET) 48[mm]
Z505(1 ST SET) Z506(2 ND SET) 12[mm]
Z506(1 ST SET) Z510(2 ND SET) 48[mm]
Z510(1 ST SET) Z511(2 ND SET) 12[mm]
Z511(1 ST SET) Z515(2 ND SET) 48[mm]
4
After M/C org. Perform setup for supply
height of VL axis similarly to the VU axis.
Install Tray Unit (Re-setup after tray unit moved)
SEET
18/19
WKGB-10105-02
Installing Tray Unit
(Re-setup after tray unit moved)
[Adjustment of path line sensor]
1
Remove front cover of tray unit.
2
Store the tray pallet into the Z501.
3
Move the VU axis to the Z501 by manual
operation.
4
Adjust sensor position, and check that it is
turned ON in the presence of tray pallet and
turned OFF in the absence of tray pallet.
5
Install the removed cover to the previous
state.
There is a palette :Light
There is not palette :Dark
I/O screen of Manual mode (Input 21,20 TI)
Install Tray Unit (Re-setup after tray unit moved)
SEET
19/19
WKGB-10105-02
Installing Tray Unit
(Re-setup after tray unit moved)
[Installation of hood]
1
Install the hood bracket with the 2-CP3x10
to S axis unit.
NOTE:
Commonly use the screws fixing the guide for the
S Axis rail.
2
Install the hood with the +T4x8.