MAN00000772_SI-G200BB_SVCPDFA.pdf - 第181页
HLGB-10204-01 PWB Camera Setup Perform this working on b o th he ads on t he front side and rear side. [Necessary jigs] • Thickness gauge (t=1.0 mm) [Procedure] When the CALIBRA TION s creen is displayed, press the Com p…

HLGB-10203-01
Acquiring Mounting Stroke Setup
Input a value of 1/1000 of the value
described in calib.ini into the Mount
height.
Example:
Press the Set button.

HLGB-10204-01
PWB Camera Setup
Perform this working on both heads on the front side and rear side.
[Necessary jigs]
• Thickness gauge (t=1.0 mm)
[Procedure]
When the CALIBRATION screen is displayed, press the Complete button to return to the
HI screen.
Press the [ORG] button on the operation panel.
Click in an order of M/C SETUP menuM/C MAINTENANCE tabCalibration button.
“
Press the [START] button on the operation panel.
For procedures when selecting head for which calibration is performed, and when changing calibration jig,
refer to the “How to display calibration screen (HLGB-10105-01)”.
Click the Machine Setup button.

HLGB-10204-01
PWB Camera Setup
Click the PWB Camera Setup button
on the Machine Setup screen.
Click the XY button on the PWB
Camera Setup screen.
XY Axis screen is displayed.
Click the Jog Move button.
Press the cursor key to jog-move the
head part onto the transfer rail.