HLGB-10204-01 PWB Camera Setup Click the PWB Camera S etup button on the Machine Set up screen. Click the XY button on the PWB Camera Setup screen. XY Axis screen is disp l a yed. Click the Jog Move button. Press the cur…

HLGB-10204-01
PWB Camera Setup
Perform this working on both heads on the front side and rear side.
[Necessary jigs]
• Thickness gauge (t=1.0 mm)
[Procedure]
When the CALIBRATION screen is displayed, press the Complete button to return to the
HI screen.
Press the [ORG] button on the operation panel.
Click in an order of M/C SETUP menuM/C MAINTENANCE tabCalibration button.
“
Press the [START] button on the operation panel.
For procedures when selecting head for which calibration is performed, and when changing calibration jig,
refer to the “How to display calibration screen (HLGB-10105-01)”.
Click the Machine Setup button.

HLGB-10204-01
PWB Camera Setup
Click the PWB Camera Setup button
on the Machine Setup screen.
Click the XY button on the PWB
Camera Setup screen.
XY Axis screen is displayed.
Click the Jog Move button.
Press the cursor key to jog-move the
head part onto the transfer rail.

HLGB-10204-01
PWB Camera Setup
Loosen cap screws (2-CP4x8) fixing
the PWB camera.
Put thickness gauge of 1.0mm between
the PWB camera and the camera
support bracket and temporarily fix
them.
Adjust inclination of the transfer rail
displayed on the PCBOARD DISPLAY
screen so as to align it with the
cross-hair line.
After adjusting inclination, tighten the
cap screws (2-CP4x8) to fix the PWB
camera.