00900002-01_UM_ASM-ProcessLens_EN - 第6页
6 Instruction Guide ASM ProcessLens 02/2017 Table Of Contents 6 Preventive Maintenance .. 77 6.1 Safety instructions .. 78 6.1.1 Safety instructions for hazardous substances .. 78 6.2 Maintenance tasks overview .…

5Instruction Guide ASM ProcessLens 02/2017
Table Of Contents
3.2.7 Solder paste inspection capabilities.. 52
3.2.8 Program generation specifications.. 52
4 Setting up and commissioning.. 53
4.1 Transport and delivery configuration.. 53
4.1.1 Shipping packaging.. 53
4.1.1.1 Transporting environment condition.. 53
4.1.1.2 Shipping packaging dimensions.. 53
4.1.1.3 Weight of machine when ready for dispatch.. 53
4.1.2 Checking a delivery.. 54
4.1.3 Configuration when delivered.. 54
4.1.4 Transporting the machine in the crate.. 55
4.1.4.1 Services.. 55
4.1.4.2 Safety instructions.. 55
4.1.4.3 Means of transport.. 55
4.1.4.4 Forklift attachment points on the transport crate or pallet.. 55
4.1.5 Transporting the machine without a crate or pallet.. 56
4.1.5.1 Safety instructions.. 56
4.1.5.2 Means of transport.. 56
4.1.5.3 Forklift attachment points on the machine.. 56
4.1.5.4 Points that MUST be noted when transporting the machine.. 57
4.2 Infrastructure at the installation location.. 58
4.2.1 Recommendations for foundation quality.. 58
4.2.1.1 Maximum ground levelness.. 58
4.2.1.2 Machine weight and floor loading.. 58
4.2.2 Main power supply.. 58
4.2.2.1 Checking the main power supply.. 58
4.2.2.2 Power supply cable - specification.. 58
4.2.2.3 Mains connection - delivery configuration.. 59
4.3 Setting up the machine.. 60
4.3.1 Warning instructions.. 60
4.3.2 Lifting and transporting the machine with the forklift truck.. 61
4.3.3 Fitting attached parts.. 62
4.3.3.1 Checking and setting the protective cover switch.. 62
4.3.3.2 Fitting the tower lamp.. 62
4.3.3.3 Fixing the monitors.. 62
4.3.4 Tools and equipment.. 63
4.3.5 Adjusting the machine height.. 63
4.3.5.1 Presetting the height of the machine feet.. 64
4.3.6 Levelling the machine.. 65
4.3.7 Removing the corrosion protection from the guide rails.. 66
4.4 Commissioning the machine.. 66
4.4.1 Commissioning the machine at the installation site.. 66
4.4.2 Removing the shipping braces.. 67
5 Working with the machine.. 71
5.1 Controls and displays.. 72
5.1.1 Overview.. 72
5.1.2 Description.. 73
5.2 Switching on/off the ASM ProcessLens.. 75

1 Introduction
1.1 Machine overview
Instruction Guide ASM ProcessLens 02/2017 7
1 Introduction
This Instructor Guide contains basic information that must be observed when setting up, operating
and maintaining the ASM ProcessLens® solder paste inspection machine. This Instructor Guide
contains notes that must be observed to guarantee your personal safety and to avoid damage to
equipment.
This document is the original Instructor Guide.
1.1 Machine overview
Fig.1: ASM ProcessLens solder paste inspection machine