Operating Instructions_VF366_en - 第380页
8|Service and maintenance ð If the mechanism is still heavily polluted or stiff: h) Let the board fixation be repaired by trained personnel. ð The process has now been completed. With regard to this, please read the Lu…

8|Service and maintenance
21 1
3
3
4
5
52
4
2
6 6
Fig.138: Board fixation: Clean and lubricate slide surfaces
ü Clean and lubricate slide surfaces of the board fixation:
ü The parts are maintenance-free and must be cleaned and lubricated only when
polluted or sluggish.
ü Use a brush or a soft wire brush to clean the slide surfaces. Do not use com-
pressed air!
a) Remove coverings (1).
b) Clean and lubricate the slide surfaces (6).
c) Clean and lubricate the wedges (2).
d) Clean and lubricate the plunger (3).
e) Clean and lubricate the slide surfaces (4).
f) Clean and lubricate the hinges (5).
ð After completing the work:
g) Check the mechanism for ease of operation.
Ersa GmbH Operating Instructions_VF366_en|Rev. 14|30/11/2017 379/551

8|Service and maintenance
ð If the mechanism is still heavily polluted or stiff:
h) Let the board fixation be repaired by trained personnel.
ð The process has now been completed.
With regard to this, please read the Lubricants used [
}293]Chapter.
Ersa GmbH Operating Instructions_VF366_en|Rev. 14|30/11/2017 380/551

9|Spare and wear parts
9 Spare and wear parts
9.1 Read this first!............................................................................................................................................... 383
9.1.1 Nameplate and machine number...................................................................................................383
9.1.2 Target readers, permitted spare parts ...........................................................................................384
9.2 Machine frames ............................................................................................................................................ 385
9.2.1 Base Module 1850 ..........................................................................................................................385
9.2.2 Base Module 900 ............................................................................................................................388
9.2.3 Additional module 1850 .................................................................................................................390
9.2.4 Additional module 900 ...................................................................................................................392
9.3 Spray fluxer and options ...............................................................................................................................394
9.3.1 Complete spray fluxer.....................................................................................................................394
9.3.2 Fixed spray head holder (single track)............................................................................................397
9.3.3 Fixed spray head support (dual track) ............................................................................................398
9.3.4 Accommodating the adjustable spray head ...................................................................................399
9.3.5 Spray monitoring (optional) ...........................................................................................................400
9.3.6 Flux material stockage....................................................................................................................401
9.3.7 Spray fluxer fiducial recognition.....................................................................................................402
9.3.8 Area-Spray head (Option)...............................................................................................................404
9.4 Positioning systems....................................................................................................................................... 405
9.4.1 Single pot positioning system (single track) ...................................................................................405
9.4.2 Z-axis single pot ..............................................................................................................................410
9.4.3 Double pot positioning system (dual track)....................................................................................411
9.4.4 Z-axis double pot (dual track) .........................................................................................................416
9.4.5 Z-axis excenter solder pot (fix, single track) ...................................................................................418
9.4.6 Positioning system for double solder pots with eccentric solder pot lids (80mm, fixed, double
stroke, single track) ........................................................................................................................419
9.4.7 Z-axis excenter solder pot (double stroke, single track).................................................................423
9.4.8 Positioning system for double solder pots with eccentric solder pot lids, y-variable ....................425
9.4.9 Z-axis excenter solder pot, y-variable.............................................................................................429
9.5 Transport system .......................................................................................................................................... 432
9.5.1 Fluxer unit conveyor system...........................................................................................................432
9.5.1.1 Fixed rail 1, (single track)..............................................................................................432
9.5.1.2 Flexible rail 1, (single track) ..........................................................................................435
9.5.1.3 Fixed rail 2, (dual track) ................................................................................................441
9.5.1.4 Flexible rail 2, (dual track) ............................................................................................444
9.5.2 Conveyor system preheater module ..............................................................................................447
9.5.2.1 Fixed rail 1, (single track)..............................................................................................447
9.5.2.2 Flexible rail 1, (single track) ..........................................................................................452
9.5.2.3 Fixed rail 2, (dual track) ................................................................................................456
9.5.2.4 Flexible rail 2, (dual track) ............................................................................................459
9.5.2.5 First stopper left, temperature resistant......................................................................461
9.5.2.6 First stopper right, temperature resistant....................................................................462
9.5.2.7 Second stopper left, (segmented preheating)..............................................................463
9.5.2.8 Second stopper right, (segmented preheating)............................................................465
9.5.3 Selective soldering unit conveyor system.......................................................................................467
9.5.3.1 Fixed rail 1, (single track)..............................................................................................467
9.5.3.2 Fixed rail 2, (dual track) ................................................................................................475
9.5.3.3 Flexible rail 1, (single track) ..........................................................................................482
9.5.3.4 Flexible rail 2, (dual track) ............................................................................................491
9.5.3.5 Roller conveyor extension, right...................................................................................498
9.6 Drives ............................................................................................................................................................499
Ersa GmbH Operating Instructions_VF366_en|Rev. 14|30/11/2017 381/551