1OM-1086-002.pdf - 第165页
Step 5 Attachment of Squeegees Attach the squeegees prepared for the model to be produced. (1) Select the [Squeegee Chg. Pos. Move (ST ART) ] button in the "Squeegee Chg." tab sheet. (Operation Sequence: [AUTO …

Fig. 2C2
••
••
• Using the Other Jigs
Consult our marketing department or sales agency for de-
tails.
Step 3 P.E.C. Test
Perform the P.E.C. recognition test for the P.C.B. to be produced,
using the "P.E.C. Recog. Test" tab sheet. (Operation Sequence:
"MAINT." Window (Main Menu) → "DEVICE TEST" Window
(Submenu) → "P.E.C. Recog. Test" Tab Sheet)
Refer to "7.1 "P.E.C. Recog. Test" Tab" (Section 6 of
Chapter 2) for details.
Step 4 Dual-Camera Auto Calibration
Correct the minute positional deviations of the P.E.C. and screen
recognition cameras, using the "2Cam. Auto Calibration" tab
sheet. (Operation Sequence: "AUTO OPN." Window (Main
Menu) → "PRODUCT CHG." Window (Submenu) → "2Cam.
Auto Calibration" Tab Sheet)
Refer to "9.8 "2 Camera Auto Calibration" Tab" (Section
5 of Chapter 2) for details.
Pick-Up Hole
Backup Jig
Holding Jig
Backup Table
Positioning Pins
0211-005 Chapter 2 3-5 Tg0582-PM-D1
2.2 Model Change Operation

Step 5 Attachment of Squeegees
Attach the squeegees prepared for the model to be produced.
(1) Select the [Squeegee Chg. Pos. Move (START) ] button in
the "Squeegee Chg." tab sheet. (Operation Sequence: [AUTO
OPN.] Button (Main Menu) → [PRODUCT CHG.] Button
(Submenu) → "Squeegee Chg." Tab Sheet)
Refer to "9.2 "Squeegee Change" Tab" (Section 5
of Chapter 2) for details.
(2) Press the [START] button on the front operation panel to
move the squeegee heads forward (toward you).
(3) Set the [OPERATION/SET UP] switch on the front opera-
tion panel to the "SET UP" side.
(4) Open the front safety cover.
(5) Push down the mechanical valve switch (for squeegee fixa-
tion) to the left side (unclamping condition) and insert the
squeegee into the center hole of the squeegee holder.
It is a little bit hard to find the center hole of the
squeegee. To confirm the center hole of the squee-
gee holder, sit down and look up to find the hole.
Fig. 2C3
Squeegee Mechanical Valve Switch for
Squeegee Fixation
0211-005 Chapter 2 3-6 Tg0582-PM-D1
2.2 Model Change Operation

(6) Push down the mechanical valve switch to the right with the
squeegee being pushed tightly against the underside of the
squeegee holder to fasten the squeegee securely.
(a) Hold the squeegee securely by hand and at-
tach it.
If the squeegee falls down on the screen, the
screen may be damaged.
It is recommended to place the screen protect-
ing plate on the screen.
(b) The squeegee should be clamped from the rear
side of the holder and then from the front side.
(c) To detach the squeegee, follow the reverse or-
der of (b) and pull down the squeegee.
Fig. 2C3-1
0211-005 Chapter 2 3-7 Tg0582-PM-D1
2.2 Model Change Operation
Screen Protecting Plate