1OM-1086-002.pdf - 第90页
Section 3 Scope of Automatic Operation 021 1-005 Chapter 1 3 - 1 Tg0582-PM-D1 This section outlines the items to be prepared and con- firmed before automatic operation and how to start or end the operation.

0211-005 Chapter 1 2-9 Tg0582-PM-D1

Section 3
Scope of Automatic Operation
0211-005 Chapter 1 3-1 Tg0582-PM-D1
This section outlines the items to be prepared and con-
firmed before automatic operation and how to start or end
the operation.

1. Normal Automatic Operation
Flow of Automatic Operations
Change of Product for Automatic Operation
Refer to "Chapter 2 Operation (Supervisor)" for details.
Inspections Work before Automatic Operation
Refer to below for details.
1.1.1 Checking of Power Supply and Air Pressure
1.1.2 Checking of Safety Door
Preparation before Automatic Operation
Refer to below for details.
1.2.1 Power ON Operation
1.2.2 "AUTO OPERATION" Window
1.2.3 Preparation for Solder Paste and P.C.B.’s
Start of Automatic Operation
Refer to below for details.
1.3 Start of Automatic Operation
Interruption of Automatic Operation
Refer to below for details.
1.4.1 Replenishment of Components and P.C.B.’s
1.4.2 Stop Operation with the [STOP] Button
1.4.3 Stop Operation by Selection of "Auto Stop Setting" Tab
Stop and Re-start of Automatic Operation
Refer to below for details.
1.5.1 Interruption with [EMERGENCY STOP] Switch
End of Automatic Operation
Refer to the following for details.
1.6 End of Automatic Operation
Shut-Down Operation
Refer to the following for details.
1.7 Shut-Down Operation
1. Normal Automatic Operation
0211-005 Chapter 1 3-2 Tg0582-PM-D1
Fig.1C1
Fig.1C2